*** Welcome to piglix ***

Cumberland Valley Railroad

Cumberland Valley Railroad
CVRR.jpg
CVRR station and offices in Chambersburg, Pennsylvania
Reporting mark CVRR
Locale U.S. states of Pennsylvania, Maryland, Virginia and West Virginia
Dates of operation 1837–1919
Successor Pennsylvania Railroad
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Headquarters Chambersburg, Pennsylvania

The Cumberland Valley Railroad (reporting mark CVRR) was an early railroad in Pennsylvania, United States, originally chartered in 1831 to connect with Pennsylvania's Main Line of Public Works. Freight and passenger service in the Cumberland Valley in south central Pennsylvania from near Harrisburg to Chambersburg began in 1837, with service later extended to Hagerstown, Maryland and then extending into the Shenandoah Valley to Winchester, Virginia. It employed up to 1,800 workers.

During the American Civil War the line had strategic importance in supplying Union troops in the Shenandoah Valley. It also ran the first passenger sleeping car in the U.S. on the Chambersburg-Harrisburg route in 1839. The Pennsylvania Railroad (PRR) gained control of the CVRR as early as 1859, and officially purchased it on June 2, 1919. The PRR's successor, the Penn Central, closed all railway facilities in Chambersburg in 1972 and its successor, Conrail, abandoned major pieces of the line in 1981.

The Cumberland Valley Railroad Company was chartered by the Pennsylvania Legislature on April 2, 1831, to construct a railroad from Carlisle to a point on the Susquehanna River at or near Harrisburg. This charter expired, but it was renewed on April 15, 1835, allowing the road to be built from the Susquehanna River to Chambersburg. On June 27, 1835, Thomas Grubb McCullough was elected as the first President of the road, and in August, William Milner Roberts was selected as Chief Engineer.

The initial cost of building the road, including a bridge across the Susquehanna, was estimated before construction at $564,064, and the average annual receipts of the road at $284,617.50, calculated at 100 passengers each way per day at 3 cents per mile, and 35,000 tons of through freight and 51,950 tons of local freight, at 4½ cents per ton per mile. $642,000 was raised by local stock subscription and construction began in the Spring of 1836.


...
Wikipedia

...