Location | |
---|---|
Location | Pilbara |
State | Western Australia |
Country | Australia |
Coordinates | 23°18′48″S 117°47′06″E / 23.313320°S 117.785103°ECoordinates: 23°18′48″S 117°47′06″E / 23.313320°S 117.785103°E |
Production | |
Products | Iron ore |
Production | 20 million tonnes/annum |
History | |
Opened | 1990 |
Owner | |
Company | Rio Tinto Iron Ore (60%) Sinosteel Corporation (40%) |
Website | Rio Tinto Iron Ore website |
The Channar mine is an iron ore mine located in the Pilbara region of Western Australia, 17 kilometres south-east of Paraburdoo.
The mine is partly owned and operated by Rio Tinto Iron Ore and is one of fifteen iron ore mines the company operates in the Pilbara. In the calendar year 2009, the combined Pilbara operations produced 202 million tonnes of iron ore, a 15 percent increase from 2008. The Pilbara operations accounted for almost 13 percent of the world's 2009 iron ore production of 1.59 billion tonnes.
The Hamersley Range, where the mine is located, contains 80 percent of all identified iron ore reserves in Australia and is one of the world's major iron ore provinces.
Rio Tinto iron ore operations in the Pilbara began in 1966. The mine itself began open-pit operations in January 1990. The combined production capacity of the Paraburdoo, Eastern Range and Channar mines is 20 million tonnes of iron ore. The ore is processed both at Channar and at Paraburdoo before being loaded onto rail, being transported from Channar to Paraburdoo by conveyor belt. Ore from the mine is then transported to the coast through the Hamersley & Robe River railway, where it is loaded onto ships. Ore from Channar, like that from Brockman, Mount Tom Price, Paraburdoo, Eastern Range, Marandoo and Yandicoogina, is transported as lump and fines ore product from the mines to Dampier via rail. Before being loaded onto ships for export, the product is blended and rescreened. The maximum size for the lumps is 31.5 mm, while the fines are at a maximum of 6.3 mm.
The mines has a residential workforce in Paraburdoo. In the calendar year 2009, the combined operations of Paraburdoo, Channar and Eastern Range employed 1,081 people, a decrease in comparison to 2008, when it employed 1,324.