Location |
Haizhu District, Guangzhou, Guangdong China |
|||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
History | ||||||||||||||||
Opened | 25 September 2010 | |||||||||||||||
Services | ||||||||||||||||
|
Changgang Station (Chinese: 昌岗站) is an interchange station of Line 2 and Line 8 on the Guangzhou Metro. The underground station is located at the intersection of Changgang Road (Chinese: 昌岗路; pinyin: Changgang Lu) and Guangzhou Avenue (Chinese: 广州大道; pinyin: Guangzhou Dadao) in Haizhu District. It started operation on 25 September 2010.
At its first operation day of the station, the number of passenger frequency was over 220,000, so traffic control was needed at the platforms of Line 2.
Coordinates: 23°05′24″N 113°16′42″E / 23.089878°N 113.278356°E