A3 motorway | |
---|---|
Route information | |
Length: | 86 km (53 mi) |
Existed: | 1975 – present |
History: | Construction paused for 7 years in 1980s; Completed in 1991 |
Major junctions | |
North end: | Rabat Ringroad |
A1, A2, A7 | |
South end: | Casablanca |
Highway system | |
Roads of Morocco |
The Casablanca–Rabat expressway, designated A3, was the first expressway to be built in Morocco, with construction starting in the 1970s. It was only completed in 1986 after a 7-year halt.
It was originally free of charge, but a toll station was erected at Bouznika in 1993 as part of a new strategy in Moroccan expressway construction. Traffic between Casablanca and Mohammedia west, as well as from Rabat to Aïn Atiq travel free of charge.
In December 2012 the operator of the road, ADM widened the road to 2 X 3 lanes. Work was started in 2009. Estimated costs for this 58 km long project are 800 Million Dirham. Main reason for expansion is the expected traffic growth, which is calculated at 55-79% between 2010 and 2020, depending on the stretch of road
Toll revenues for the Casablanca–Rabat expressway are the highest in the country, generating 306 million dirhams in 2007 (252 million in 2006), nearly a third of all toll-revenues in Morocco.
The route starts at the centre of Casablanca, and then joins the A5 Casablanca bypass at the junction just before the west Mohammedia interchange. It continues past the east interchange serving Mohammedia before reaching the toll station at Bouznika. After passing Skhirat and Aïn Atiq the road reaches Temara on the outskirts of Rabat. Traffic going to Fes and Tangier then exit at Hay Riad to converge onto the non-expressway Rabat bypass. The motorway regulations end just before the entrance to the city at the Prince Moulay Abdellah sports complex.