*** Welcome to piglix ***

Caledonian Main Line


The Caledonian Railway main line in Scotland connected Glasgow and Edinburgh with Carlisle, via Carstairs and .

It was opened in 1847 by the Caledonian Railway. The approach to Glasgow used railways already built, primarily for mineral traffic; these were later by-passed by a more direct route.

Today, the route forms the northern section of the West Coast Main Line, and was electrified in the early 1970s.

From 1830 onwards considerable attention was given to the means by which Glasgow and Edinburgh might be connected to London, and as English railways began to develop into a network, the urgency of making a railway accelerated. The difficult terrain of the Southern Uplands and Cumberland made the selection of a route controversial. After much difficulty, the Caledonian Railway was authorised to build a line via Beattock; this was known as the Annandale Route.

On 10 September 1847 the line was opened between Carlisle and Beattock. The station at Carlisle was built and operated jointly with the London and North Western Railway. (Later other companies shared in the operation there.) Construction continued and on 15 February 1848 the line was opened between Beattock and Glasgow, completing the Carlisle to Glasgow route. Finally the line from Carstairs to Edinburgh opened on 1 April 1848.

At first the southern termination of the line was at Carlisle station, later named Carlisle Citadel; passengers and goods were handled there. The line ran broadly north across gently undulating country at first, crossing the River Esk and entering Scotland near Gretna, then climbing following the Kirtle Water to Lockerbie. Climbing further, the line followed the Annan Water to Beattock, and on to Beattock Summit. Crossing the watershed, the line now descended in the upper Clyde Valley; the course of the Clyde here is much more hilly and the line follows a series of broad reverse curves as it continues through Abington and Thankerton, emerging on to slightly flatter terrain at Carstairs.

Now turning north-west, the Glasgow line continues past Lanark and near Carluke, joining the Wishaw and Coltness Railway (W&CR) at Garriongill Junction. The W&CR had been built as a "coal railway", primarily intended for the haulage of coal and iron ore. It had been upgraded and modernised, and leased by the Caledonian Railway. The main line used the W&CR line to Motherwell, from which point the original route is not part of the modern main line. It turned north through to Whifflat (now spelt Whifflet), joining the Glasgow, Garnkirk and Coatbridge Railway. This too had been built as a coal railway, and had been upgraded and renamed the Garnkirk and Glasgow Railway; it too was leased by the Caledonian Railway. From Whifflat the line ran to Coatbridge, and then turned west on through Garnkirk, terminating at the GG&CR Glasgow terminus at Townhead.


...
Wikipedia

...