*** Welcome to piglix ***

Broxbourne railway station

Broxbourne National Rail
Broxbourne railway station Platforms & bridge.jpg
Broxbourne is located in Hertfordshire
Broxbourne
Broxbourne
Location of Broxbourne in Hertfordshire
Location Broxbourne
Local authority Borough of Broxbourne
Grid reference TL374072
Managed by Abellio Greater Anglia
Station code BXB
DfT category C2
Number of platforms 4
Fare zone B
National Rail annual entry and exit
2011–12 Increase 1.431 million
– interchange  Increase 0.266 million
2012–13 Increase 1.606 million
– interchange  Increase 0.301 million
2013–14 Increase 1.630 million
– interchange  Increase 0.312 million
2014–15 Increase 1.708 million
– interchange  Decrease 0.301 million
2015–16 Increase 1.780 million
– interchange  Increase 0.308 million
Railway companies
Original company Northern and Eastern Railway
Pre-grouping Great Eastern Railway
Post-grouping London and North Eastern Railway
Key dates
15 September 1840 (1840-09-15) Opened as Broxbourne and Hoddesdon
? Renamed Broxbourne
Other information
Lists of stations
External links
WGS84 51°44′49″N 0°00′40″W / 51.747°N 0.011°W / 51.747; -0.011Coordinates: 51°44′49″N 0°00′40″W / 51.747°N 0.011°W / 51.747; -0.011
Underground sign at Westminster.jpg
170433 at Edinburgh Waverley.JPG

Broxbourne railway station, opened in 1840, serves the towns of Broxbourne and Hoddesdon in Hertfordshire, England. It is on the West Anglia Main Line, and train services are provided by Abellio Greater Anglia, which also manages the station.

Broxbourne Station was officially opened by the Northern and Eastern Railway on 15 September 1840. It was on their proposed line to Cambridge, but the next section of the line to Latton Mill (Harlow) was not opened until August 1841. Therefore, for a short period of time Broxbourne served as the terminus for the line which ran up the Lea Valley from Stratford Junction where it joined the Eastern Counties Railway. The station was moved from its original site in Station Road to the present site in 1959.

The station was Grade II listed in March 2009; "one of a very small number of post-war railway stations of clear architectural distinction".

Ticket barriers were installed in 2011.

The centre platforms (platforms 2 and 3) were extended to accommodate 12-coach trains in December 2011, though initially no 12-coach trains were scheduled to call.

Of the four platforms, platform 1 is used by terminating or starting services to and from Liverpool Street, Stratford and Hertford East, platform 2 is used by services to Liverpool Street and Stratford, platform 3 is used by services to Hertford East, Cambridge and Bishops Stortford and platform 4 is used by services to Hertford East.

The typical Monday-Saturday off-peak service is:

On Sundays the off-peak service is:



...
Wikipedia

...