Brookwood | |
---|---|
Brookwood railway station
|
|
Location | |
Place | Brookwood |
Local authority | Borough of Woking |
Coordinates | 51°18′14″N 0°38′10″E / 51.304°N 0.636°ECoordinates: 51°18′14″N 0°38′10″E / 51.304°N 0.636°E |
Grid reference | SU951569 |
Operations | |
Station code | BKO |
Managed by | South West Trains |
Number of platforms | 2 |
DfT category | C2 |
Live arrivals/departures, station information and onward connections from National Rail Enquiries |
|
Annual rail passenger usage* | |
2011/12 | 0.934 million |
– Interchange | 60,013 |
2012/13 | 0.941 million |
– Interchange | 56,896 |
2013/14 | 0.966 million |
– Interchange | 52,223 |
2014/15 | 0.990 million |
– Interchange | 55,601 |
2015/16 | 0.995 million |
– Interchange | 61,231 |
History | |
Key dates | Opened 1 June 1864 |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Brookwood from Office of Rail and Road statistics. Methodology may vary year on year. | |
Brookwood is a National Rail railway station in Brookwood in the English county of Surrey.
The London and Southampton Railway (L&SR) was authorised on 25 July 1834. It was built and opened in stages, and the second section, that between Woking (then known as Woking Common) and Winchfield, was opened on 24 September 1838; there was only one intermediate station on this section, at Farnborough. On 4 June 1839, the L&SR was renamed the London and South Western Railway (LSWR).
Funeral trains from London to Woking Cemetery first ran in 1849. The opening of Brookwood Cemetery (and the associated London Necropolis railway station close to London Waterloo) led to an increase in the funeral traffic. A branch line left from the main line station to serve two stations within the cemetery, Brookwood Cemetery North and Brookwood Cemetery South. In June 1863, the LSWR agreed to provide a station on the main line, to serve both the adjacent cemetery and Brookwood village; this opened on 1 June 1864.
A branch line to the north of the line at Brookwood was opened on 14 July 1890. It served Bisley Camp of the National Rifle Association.
The station was reconstructed in 1903, with a new down platform, 576 feet (176 m) long, being built to the south of the original. It was connected to the up platform by a new subway, the footbridge being removed. This made room for the double-track main line to be quadrupled; the new tracks through the station (1 mile 70 chains (3.0 km) between Brookwood East and Pirbright Junction) being brought into use on 15 November 1903. New pneumatic signalling between Woking and Basingstoke was provided between 1904 and 1907; the stretch between Farnborough and Woking was brought into use during June–July 1907, and included a new signal box at Brookwood, having 35 working levers. This box, like the previous Brookwood East manual signalbox, was on the down side of the line.