The Birmingham Snow Hill to Wolverhampton Low Level Line was part of the Great Western Railway's London Paddington to Birkenhead Woodside route. As the name suggests, it ran between Birmingham Snow Hill and Wolverhampton Low Level in England. The line was dual-gauged, both 7 ft (2,134 mm) and standard gauge.
The line opened in 1854 and finally closed August 1992. The opening was delayed for two months because a bridge collapsed near Winson Green, which caused chief engineer Isambard Kingdom Brunel to order strengthening on several other bridges.
The Birmingham, Wolverhampton and Dudley Railway was authorised on 3 August 1846. It quickly joined forces with the Birmingham and Oxford Junction Railway and both companies were bought by the Great Western on 14 November 1846. Construction began at Birmingham Snow Hill in 1851 and the line opened on 14 November 1854. Stations were: Birmingham Snow Hill - Hockley - Soho & Winson Green - Hawthorns Halt - West Bromwich - Swan Village - Wednesbury Central - Bradley & Moxley - Bilston Central - Priestfield - Wolverhampton Low Level.