Basque Y is the high-speed rail network being built between the three cities of the Basque Country autonomous community, in Spain; Bilbao, Vitoria-Gasteiz and Donostia-San Sebastián.

It will transport cargo and passengers. The cargo trains will connect the Port of Bilbao with the Port of Pasaia, (also known as Pasajes/Pasajes-San Pedro) and will consist of 157 kilometers of double track and 37 kilometers of single track. Due to the mountainous relief of the region, 105,9 km (62%) will be in 80 tunnels and 10% in 71 bridges. The minimum speed is 120 km/h, whilst the maximum is 250 km/h.

The Basque Y will be built in European rail gauge (1,435 mm (4 ft 8 12 in) ). It will connect Madrid via Valladolid and connect France via Irun. While the French high-speed rail line (on which the TGV trains achieve their top speeds) is not planned to reach Hendaye until 2020, the Hendaye-Bordeaux track allows 160 km/h. The network will also include a connection to the Navarrese Corridor, the high speed line projected between Zaragoza and the capital of Navarre, Pamplona.

As announced initially, it could take well under one hour to connect the cities while the current slower network takes from 1 h 40 min to 2.5 hours. However, a closer study revealed in February 2015 that the projections below do not possibly hold water, conspicuously delaying initial time estimates.

It took 15 years from the first proposals of a Basque high-speed network to the detailed project. The main issues were disagreements between the series of Spanish and Basque governments, and who would bear the costs. Through the Basque tax agreement, the Spanish government will make initial payments on behalf of the Basque government.


...