Bali Mandara Toll Road | |
---|---|
Route information | |
Part of | |
Maintained by PT Jasamarga Bali Tol (JBT) | |
Length: | 12.7 km (7.9 mi) |
Existed: | 2013 – present |
History: | - |
Major junctions | |
From: | Nusa Dua |
To: |
Ngurah Rai International Airport Benoa |
Location | |
Major cities: | Denpasar |
Highway system | |
Roads and Highways in Indonesia |
Bali Mandara Toll Road or Nusa Dua-Ngurah Rai-Benoa Toll Road is a toll road carried by a bridge stretching across the Gulf of Benoa 12.7 km in length. The Rp 2.48 Trillion (USD 220 million) highway connects the city of Denpasar and South Kuta, Badung Regency, Nusa Dua and Ngurah Rai International Airport. The reason behind construction of Bali Mandara Toll Road was to prevent traffic jams on the Ngurah Rai By Pass Road, previously the only road connecting areas of Bali south of the airport with areas north of the airport. The Ngurah Rai By Pass Road, a land-based route, could not be widened because of the location of the airport runway. Consequently, the Bali Mandara Toll Road was built over water.
This toll road was officially opened on 23 September 2013 by President Susilo Bambang Yudhoyono.