Azrieli Sarona Tower | |
---|---|
מגדל עזריאלי שרונה | |
The tower in December 2016
|
|
General information | |
Status | Under construction |
Type | Office • Commercial • Hotel |
Location | Tel Aviv, Israel |
Coordinates | 32°04′19″N 34°47′19″E / 32.07194°N 34.78861°ECoordinates: 32°04′19″N 34°47′19″E / 32.07194°N 34.78861°E |
Construction started | 2013 |
Opening | 2017 |
Cost | ILS ₪ 1.5 billion |
Height | |
Roof | 238 m (781 ft) |
Technical details | |
Floor count | 61 |
Design and construction | |
Architect | Moshe Tzur Architects and Town Planners |
Developer | Azrieli Group |
The Azrieli Sarona Tower is a skyscraper under construction, located at the South HaKirya compound on Begin Road in Sarona, Tel Aviv. It has been topped-out, and is scheduled to be fully completed in 2017. It is 238.5 metres (782 ft) high with 53 floors. It is the tallest building in Israel, followed by Ramat Gan's 235 meter high Moshe Aviv Tower.
In May 2011, the Azrieli Group acquired the land plot for INS ₪ 522 million via tender from the Israel Land Administration. The plot's size is 9.4 dunam and had a plan for a 180 metres (590 ft) high office building with a volume of 82,710 square metres (890,300 sq ft) and 6,700 square metres (72,000 sq ft) for commercial use, but in 2012 the Azrieli Group appealed the Regional Committee for Planning and Construction of the Tel Aviv District, asking to transfer 3,300 square metres (36,000 sq ft) to increase the area for commercial use. The committee accepted the request, but the demanded that an eighth garage floor will be built. Due to the expected high price (₪70 million) and the increased construction time, a compromise was achieved and instead of an eighth garage floor, 500 of the parking lots will be designated for public use and the residents of Tel Aviv will not pay any price higher than the price charged in parking stations owned by the municipality of Tel Aviv. The seven-story underground garage will have a total of 1,600 parking lots, and the commercial center will spread over the first three floors. At the 33rd to 37th floor, an hotel will be built.
In 2013 the Regional Committee for Planning and Construction of the Tel Aviv District authorized the construction of a building 255 metres (837 ft) above sea level (i.e. 238.5 metres (782 ft) above ground level).
The Cornerstone was placed by David Azrieli in a ceremony on 12 March 2012. In June 2016, 60% of the tower were already leased.