Awana Skyway | |
---|---|
One of the new gondola units of Awana Skyway since its re-opening on August 2016.
|
|
Overview | |
Status |
(Old) Ceased operations since 1 April 2014 (New) Operational |
System |
(Old) Aerial tramway (New) Gondola lift |
Location | Genting Highlands, Pahang, Malaysia |
Termini | Awana Hotel Resort World Genting Sky Avenue Resort World Genting |
No. of stations | 3 |
Open |
(Old) 1977 (New) August 2016 |
Operation | |
Owner | Resort World Genting |
Carrier capacity |
99 standard gondolas up to 10 passengers ,10 glass-floored gondolas up to 6 passengers Up to 3,600 passengers per hour |
Trip duration | 10 min |
Technical features | |
Aerial lift type | Cable car |
Line length | 2,400 m (7,900 ft) |
Operating speed | 6 m/s |
(Old) Ceased operations since 1 April 2014
(Old) Aerial tramway
(Old) 1977
99 standard gondolas up to 10 passengers ,10 glass-floored gondolas up to 6 passengers
The Awana Skyway, also referred to as the new Awana Skyway (circa. 2016), is a gondola lift connecting Awana Transport Hub, Chin Swee Temple and SkyAvenue in Genting Highlands, Pahang, Malaysia. The Awana Transport Hub terminus consists of the new Awana Bus Terminal, the station building and a new 8-storey car park while the other terminus is located at SkyAvenue. The new skyway was opened around August 2016.
It can carry up to 3,600 passengers per hour with 10 passengers per gondola. At the maximum speed of 6 metres per second (21.6 km/h), the 2.8-kilometre journey up the mountain peak takes about 10 minutes, though it varies on the weather conditions. The former uses an aerial tramway system while the latter uses gondola lift.
The old cable car uses a jig-back system: A large electric motor is located at the bottom of the tramway so that it effectively pulls one cabin down, using that cabin's weight to help pull the other cabin up. A similar system of cables is used in a funicular railway. The two passenger cabins are situated at opposite ends of the loops of cable. Thus, while one is coming up, the other is going down the mountain, and they pass each other midway on the cable span. It ceased its operations since 1 April 2014 to make way for the construction of an all-new monocable gondola system similar to the one used on Genting Skyway by Leitner Ropeways.
The new monocable gondola lift built by Leitner Ropeways uses 60 mm diameter solid cable wire ropes as opposed to Genting Skyway's 54 mm diameter solid cable wire ropes. Likewise, they are among the strongest monocable gondola installations in the world. Similarly, it is equipped with high-tech electronic equipment and was built in accordance with stringent Swiss regulations. It also has a double safety circuit which is completely independent.
The foundation used for the pylons is of the "Hang-dug Caisson" type. Each pylon is founded on four Caissons measuring 1.2 metres in diameter, which are socketed down to bedrock. The average depth of the Caissons is about 40 m (135 feet) and each group of four Caissons piles can take a vertical load of 4,000 tonnes against the maximum vertical load of 150 tonnes from the cable car system. The Caissons method is about the safest and strongest foundation in existence, designed specifically for hilly terrain. Each pylon is accessible via rescue tracks on the ground, whilst each gondola is equipped with radio communication equipment from the stations. The new gondola lift spans on 22 pylons as opposed to the former 5 towers.