Ascutney Mill Dam

Windsor Upper Dam
Ascutney Mill.jpg
Windsor Upper Dam
Location Windsor, Vermont
Construction began June 1834
Opening date November 1834
Operator(s) Ascutney Mill Dam Company
Dam and spillways
Impounds Mill Brook
Height 40 ft (12 m)
Length 250 ft (76 m)
Width (base) 36 ft (11 m)
Ascutney Mill Dam Historic District
Ascutney Mill Dam is located in Vermont
Ascutney Mill Dam
Ascutney Mill Dam is located in the US
Ascutney Mill Dam
Location 55 and 57 Ascutney St., Windsor, Vermont
Coordinates 43°28′36″N 72°23′46″W / 43.47667°N 72.39611°W / 43.47667; -72.39611Coordinates: 43°28′36″N 72°23′46″W / 43.47667°N 72.39611°W / 43.47667; -72.39611
Area 4.8 acres (1.9 ha)
Built 1783
Architect Cobb, Simeon
Architectural style Federal, Greek Revival
NRHP Reference # 06001236
Added to NRHP January 09, 2007

Ascutney Mill Dam, also known as the Windsor Upper Dam and the Mill Pond Dam, is an arch-gravity dam which is one of the oldest and among the earliest storage dams in the United States. It is made of cut granite and is located in Windsor, Vermont in Windsor County near the Connecticut River where it functioned as a source of hydropower and later, hydroelectric power. It is on the ASCE list of historic civil engineering landmarks since 1970 and is listed on the National Register of Historic Places (as Ascutney Mill Dam Historic District) since January 09, 2007.

The dam is built in the valley of the Mill Brook, a right tributary of the Connecticut River. The pond above the dam is known as the Mill Pond.

The Ascutney Mill Dam Company was formed to build the dam. Construction began in June 1834 and was finished in November. The purpose of the dam was to regulate seasonal water flow and provide hydropower for nearby sawmills and gristmills, which previously could not operate during periods of low water flow in Mill Brook. The dam allowed water to be stored in the impound during the winter for release during lower flow seasons.

Ithamar A. Beard was a New England engineer who surveyed the area and selected the site for the dam. Simeon Cobb and Joseph Mason were the contractors in charge of building the dam.

As early as 1767 several sawmills and gristmills were operating along the banks of Mill Brook in Windsor, however, during periods of low water flow the mills stood idle. Like many early towns their location was often selected on the availability of such a resource. Water-powered mills to save human labor have been used since ancient times, but like all renewable energy resources, their power is not always available when needed. Sawmills were important facilities which cut logs into boards for construction, as were gristmills, which ground grain into flour. In post-colonial Vermont, these mills were essential for building and food supply needs of the growing cities.


...