*** Welcome to piglix ***

Ankara–Sivas high-speed railway

Ankara–Sivas high-speed railway
YHT at Ankara.JPG
The westernmost point of the line, Ankara railway station
Overview
Type High-speed rail
System Turkish State Railways
Status Under construction
Locale Central Anatolia
Termini Ankara
Sivas
Operation
Opened 2018 (expected)
Owner Turkish State Railways
Operator(s) Turkish State Railways
Depot(s) Güvercinlik Yard
New Etimesgut Yard Future
Technical
Line length 406 km (252.28 mi)
Number of tracks Double track
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 3,500 m
Electrification 25 kV, 50 Hz AC overhead line
Operating speed 250 km/h (160 mph)
Maximum incline 18

The Ankara–Sivas high-speed railway (Turkish: Ankara–Sivas yüksek hızlı demiryolu), is a 406 km (252 mi) long high-speed railway currently under construction in Turkey. Once completed, it will be the second longest high-speed railway in Turkey after the Istanbul-Ankara high-speed railway.

As there's no direct railway link between Ankara and Sivas, the travel time by train takes too much time compared to road transport. Railway link between Ankara and Sivas passes through Kayseri currently. In line with TCDD's willing to increase the part of rail transport in global transportation, survey for a new high-speed railway line began on 2004. Constructions began in 2008 with major stops during 2010 due to changes in the project. When completed, the journey time is expected to be reduced to 2h and 50min compared to 12h (currently).

Constructions are divided into four sections:


...
Wikipedia

...