*** Welcome to piglix ***

Ampang Line (Sentul Timur-Sri Petaling)

Ampang Line & Sri Petaling Line
 3   4 
Rapid KL (brand)
170607 KL city centre from PWTC.jpg
Overview
Native name LRT Laluan Ampang & LRT Laluan Sri Petaling
Type Rapid transit
System Rapid KL - LRT KL System 1 (LRT1)
Status Operational
Locale Klang Valley
Termini Start: Sentul Timur
End: Putra Heights & Ampang
Stations 36 & 2 reserve
Services i) Sentul Timur - Ampang
ii) Sentul Timur - Putra Heights
Daily ridership 172,080 (2015)
Ridership 62.089 million (2015)
(Decrease 1.8%)
Line number  3  &  4 
Website My Rapid
Operation
Opened 16 December 1996; 20 years ago (1996-12-16)
Last extension 30 June 2016; 12 months ago (2016-06-30)
Owner Prasarana Malaysia
Operator(s) Rapid Rail
Character Elevated and at-grade
Depot(s) Ampang Depot &
Kuala Sungai Baru Depot
Rolling stock CSR Zhuzhou LRV
35 six-car trainsets
Width: 2.65 m (8 ft 8 in)
Length: 84.0 m (275.6 ft)
Technical
Line length 45.1 km (28.0 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification Third rail
Operating speed 60 km/h (37 mph)
Route map
SP1 Sentul Timur Parking
SP2 Sentul (LRT) Parking
SP3
MR11
Titiwangsa MadridMetro-BusUrbano.svg MadridMetro-EMT.svg  8   12 
SP4 PWTC
KA04 Putra  1   2 
SP5 Sultan Ismail MadridMetro-BusUrbano.svg MadridMetro-EMT.svg
SP6 Bandaraya MadridMetro-EMT.svg
KA03 Bank Negara  1   2 
SP7
KJ13
Masjid Jamek  5 
SBK17 Merdeka  9 
SP8 Plaza Rakyat MadridMetro-LargoRecorrido.svg Pudu Sentral
SP9
MR4
Hang Tuah  8 
SP10 Pudu
 
 
Wikipedia

...