Construction began | 2001-2002 |
Opening date |
No(1)...February 18, 2010 No(4)...December 15, 2010 No(2)...August 7, 2010 No(3)...June 16, 2010 |
Construction cost | US$700 million Designed by Colenco Power Engineering Ltd. (Switzerland) |
Owner(s) | Department of Hydropower, Ministry of Electricity and Energy (Myanmar) |
Dam and spillways | |
Type of dam | Gravity, roller-compacted concrete |
Impounds | Myitnge River, a tributary of the Ayeyarwady River |
Height | 134 m (440 ft) |
Length | 690 m (2,260 ft) |
Spillway type | ungated spillway 157 m (515 ft) crest width 136 m (446 ft) net width |
Spillway capacity | design flood: 6,600 m3 (5.4 acre·ft)/s |
Reservoir | |
Total capacity | 2.6×109 m3 (9.82 Tmcft) gross storage 1.6×109 m3 (56.5 Tmcft) active storage |
Catchment area | 10,890 sq mi (28,200 km2) |
Surface area | 14,580 acres (59.0 km2) |
Maximum water depth | >180 m (590.6 ft) |
Power Station | |
Operator(s) | Myanmar Electric Power Enterprise |
Commission date | 2010 |
Turbines | 4 x 197.5 MW (264,900 hp) Francis-type |
Installed capacity | 790 MW (1,060,000 hp) |
Annual generation | 3,550 GWh (12,800 TJ) |
Website Yeywa Dam |
No(1)...February 18, 2010
No(2)...August 7, 2010 No(3)...June 16, 2010The Yeywa Hydropower Station (Burmese: ရဲရွာရေအားလျှပ်စစ်ဓာတ်အားပေးစက်ရုံ), located on the Myitnge River, 52 kilometres (32 mi) southeast of Mandalay city, at Yeywa village in Kyaukse Township, Mandalay Region in central Myanmar, is the country's first roller-compacted concrete (RCC) dam, and the site of a 790-megawatt (1,060,000 hp) hydroelectric power plant, the largest in the country.
The plant feasibility study was done in 1999. In May 2001, agreement of consulting service between MEPE and COLENCO Power Engineering, Ltd. had signed. In 2003 agreement part 2 for Detail Design, preparation of tender documents and guidance services for construction supervision was signed. The river diversion was completed on December 12, 2004 and RCC placement began on February 8, 2006. The Burmese government announced plans for the Yeywa Dam in late 2001. In 2004, Burma’s Ministry of Electric Power (MEPE) signed a Memorandum of understanding with a consortium of Chinese companies created by China International Trust & Investment Co. (CITIC) and Sinohydro Corporation for implementation of the project. On September 2, 2005, a ceremony to mark the signing of contract between the Hydroelectric Power Department under the Ministry of Electric Power and the China National Heavy Machinery Corporation (CHMC) for the Yeywa Hydroelectric Power Project was held in Yangon [Rangoon], Site work began in 2004 and all four generators were commissioned in 2010. The project was completed in November 2011.