William H. Natcher Bridge

William H. Natcher Bridge
US 231 Natcher Bridge - Up River.jpg
View of William H. Natcher Bridge with the Rockport Generating Station in the distance.
Coordinates 37°54′04″N 87°02′02″W / 37.901172°N 87.033933°W / 37.901172; -87.033933Coordinates: 37°54′04″N 87°02′02″W / 37.901172°N 87.033933°W / 37.901172; -87.033933
Carries 4 lanes of US 231
Crosses Ohio River
SR 66
Locale Maceo, Kentucky to Rockport, Indiana
Maintained by Kentucky Transportation Cabinet (KYTC)
Characteristics
Total length 4,505 feet (1,373 m)
Width 67 feet (20 m)
History
Opened October 21, 2002

The William H. Natcher Bridge is a cable-stayed bridge that carries U.S. Highway 231 over the Ohio River. The bridge connects Owensboro, Kentucky to Rockport, Indiana and opened on October 21, 2002. It is named in honor of William Huston Natcher, a former United States Representative who served Kentucky's 2nd Congressional District from 1954 until his death in 1994. The bridge project was named for Natcher only three months before his death. It is owned by the Commonwealth of Kentucky and was commissioned by the Kentucky Transportation Cabinet, in cooperation with the Indiana Department of Transportation and the Federal Highway Administration.

The William H. Natcher Bridge is 4,505 feet (1,373 m) in length (including its approaches) and 67 feet (20 m) wide. It is supported by cables connected to two identical diamond-shaped towers, each 374 feet (114 m) tall. At the time of its construction, it was the United States' longest cable-supported bridge over an inland waterway.

The concept for a new bridge to serve Owensboro dates back to 1987, when a Green River Area Development District study recommended a new bridge to connect to U.S. Highway 231 in Rockport, where the highway separated from Indiana State Road 66 mere feet away from the river's bank. Congressman Natcher first began seeking federal funds for the new bridge in 1988. Construction ran across the late 1990s and early 2000s at a cost of US$70 million (approximately $40 million from federal sources, $30 million from state sources). Originally slated for a 1996 completion, the bridge was the victim of numerous funding delays from both the federal and state levels. Though the concrete piers (the bases which support the upright towers) were installed in 1995, construction on the bridge itself did not begin until 1998. Even then, the original plan was to have the bridge completed by the end of 2000, but the builders said that goal was unrealistic due to the complicated nature of the cable installation. It was finally dedicated on August 16, 2002, but did not open to traffic until October 21, 2002. The Natcher Bridge was designed by Parsons, Brinckerhoff, Quade & Douglas, Inc. and built by Traylor Brothers of Evansville.


...