USS Wichita (AOR-1), 1985
|
|
Class overview | |
---|---|
Name: | Wichita |
Builders: | |
Succeeded by: | Cimarron-class fleet replenishment oiler |
In commission: | 1969–1995 |
Completed: | 7 |
Retired: | 7 |
General characteristics | |
Type: | replenishment oiler |
Displacement: |
|
Length: | 640 ft (195 m) wl; 659 ft (201 m) oa |
Beam: | 96 ft (29 m) |
Draft: | 35 ft (10.6 m) |
Propulsion: |
|
Speed: | 25 knots |
Complement: | 34 officers, 463 men |
Armament: |
|
Aircraft carried: | 2 × UH-46 Sea Knight helicopters |
Wichita-class replenishment oilers comprised a class of seven replenishment oilers used by the United States Navy from the late 1960s to the mid-1990s. The ships were designed for rapid underway replenishment using both connected replenishment and vertical replenishment.
The original concept for the Wichita-class was that the ships would serve the same function for the anti-submarine carrier (CVS) groups that the larger, faster Sacramento-class ships did for the attack carrier (CVA) groups. During this time the ships were commissioned naval auxiliaries with the hull classification AOR.
The ships could carry 160,000 barrels (2,544,000 litres) of fuel oil, 600 tons of munitions, 200 tons of dry stores and 100 tons of refrigerated stores. To transfer cargo, the ships were equipped with four oiling stations and two cargo handing stations on the port side and three oiling stations and two cargo handing stations on the starboard side. Originally, the first six ships only had a large helicopter landing deck aft, but no hangar. Roanoke was the first ship equipped with a large double hangar for two UH-46 Sea Knight helicopters. The hangar was later retrofitted to the other ships.
With the addition of the hangar, the ships lost the originally fitted 3″/50 caliber gun twin mounts that were located abaft the stack. In the 1980s, a Mk 29 launcher for the NATO Sea Sparrow was fitted atop the hangar, and two Phalanx CIWS were added.
General Dynamics, Quincy originally encountered problems during the construction, before the production was rationalised. Wichita took 24 months from keel laying to launch, Milwaukee 21 month, and Kansas City only 14 months.