*** Welcome to piglix ***

Westland Westminster

Westminster
SBAC 58 Westminster.jpg
First prototype G-APLE at Farnborough 1958
Role Heavy-lift helicopter
National origin United Kingdom
Manufacturer Westland Aircraft
First flight 15 June 1958
Status Cancelled
Number built 2
Developed from Sikorsky S-56

The Westland Westminster was a British helicopter of the 1950s from Westland Aircraft. A large cargo design, it was powered by two turboshaft engines driving a single, five-bladed rotor. Initially unclad, the all-metal airframe was later enclosed in a fabric covering. Designed and built as a private venture without government assistance, it was cancelled when Westland took over rival helicopter producers and their more advanced projects.

The Westminster was the first tangible result of efforts that Westland Aircraft had been making throughout the 1950s to produce a gas-turbine-powered heavy-lift helicopter. Projects ranged up to the remarkable W.90, a 450-seat troopship with three Sapphire turbojets mounted on its rotor-tips.

In 1954, Westland investigated licensed manufacture of the Sikorsky S-56 for the civil market with turboshaft power. The company sought Ministry of Supply support for the proposal, but this was not forthcoming. In June 1958, Westland obtained an extension to their licence agreement with Sikorsky to cover the five bladed main-rotor, gearbox, tail-rotor, transmission and control systems of the S-56. Faced with continuing government indifference, Westland decided to press ahead with a private-venture design for a heavy-lift transport, built around the S-56 systems but powered by a pair of Napier Eland turboshafts. At the time, Westland was heavily committed to development of the Wessex and the Westminster project had to be run on a shoestring.

Two variants were initially envisioned: a 40-seat, short-range civil transport and a flying crane with a 15,000 lb capacity. In March 1956, Westland decided to build the first prototype as a flying test rig with a tubular steel space frame in place of the main fuselage; cockpit power-train and undercarriage attached to this. With economy a priority, off-the-shelf components were used as far as possible, with donors such as the Westland Whirlwind helicopter and the Bristol Freighter aeroplane. This prototype was completed in February 1958; after the usual static and systems testing, engine runs and nearly 20 hours of "tied-down" engine testing, the first flight took place on 15 June. Flight testing showed up significant vibration. As a result, a number of changes were made in the design of the second prototype, including replacement of the main-rotor with the six-blade unit from the Sikorsky S-64. Once the statutory ten hours had been flown, this first Westminster was registered G-APLE and work started on constructing the second prototype.


...
Wikipedia

...