RFA Wave Wave Ruler (at left) carrying out a replenishment at sea with the frigate HMS Iron Duke in 2006
|
|
Class overview | |
---|---|
Name: | Wave class |
Builders: | VSEL (later BAE Systems Marine) |
Operators: | Royal Fleet Auxiliary |
Preceded by: | Ol class |
Succeeded by: | Tide class |
In commission: | 8 April 2003–present |
Completed: | 2 |
Active: | 2 |
General characteristics | |
Type: | Fast fleet tanker |
Displacement: | 31,500 tonnes approx |
Length: | 196.5 m (644 ft 8 in) |
Beam: | 28.25 m (92 ft 8 in) |
Draft: | 9.97 m (32 ft 9 in) |
Propulsion: |
|
Speed: | 18 knots (33 km/h) |
Range: | 10,000 nautical miles (20,000 km) at 15 knots (28 km/h) |
Capacity: |
|
Complement: | 80 Royal Fleet Auxiliary personnel with provision for 22 Royal Navy personnel for helicopter and weapons systems operations |
Sensors and processing systems: |
|
Armament: |
|
Aircraft carried: | 1 × Merlin helicopter with full hangar facilities |
The Wave-class tankers are a class of fast fleet tankers in service with the Royal Fleet Auxiliary. The class is tasked with providing fuel, food, fresh water, ammunition and other supplies to Royal Navy vessels around the world. There are two ships in the class, RFA Wave Knight and RFA Wave Ruler. The ships were ordered to replace the aging Ol-class tankers RFA Olna and RFA Olwen. The two vessels have seen service in a number of locations, including anti-drug and hurricane relief operations in the Caribbean Sea, anti-piracy activities around the Horn of Africa and deterrent patrols in the South Atlantic.
A contract was placed for the vessels in 1997 with Vickers Shipbuilding and Engineering Ltd (Marconi Marine VSEL). Construction of Wave Knight began in 1998 at VSEL's Barrow-in-Furness yard and the ship was launched in 2000. With the acquisition of Marconi Electronic Systems and its Marconi Marine subsidiary in 1999 British Aerospace became BAE Systems. BAE now owns VSEL in Barrow and the Yarrow and Govan shipyards on the Clyde. BAE transferred the construction of Wave Ruler to Govan in 2000 and the vessel was launched in 2001. Both vessels were commissioned in 2003.