*** Welcome to piglix ***

WAGR Ec class

WAGR Ec class
Ec249, Kellerberrin, ca. 1903.jpg
Type and origin
Power type Steam
Builder Baldwin Locomotive Works
Total produced 20
Rebuilder Midland Railway Workshops
Rebuild date 1924-25 as L class
Number rebuilt 20
Specifications
Configuration:
 • Whyte 4-6-2
Gauge 3 ft 6 in (1,067 mm)
Total weight Ec: 73 long tons 0 cwt (163,500 lb or 74.2 t)
L: 77 long tons 12 cwt (173,800 lb or 78.8 t)
Fuel type Coal
Fuel capacity 5 long tons 0 cwt (11,200 lb or 5.1 t)
Water cap 2,500 imp gal (11,000 l; 3,000 US gal)
Firebox:
 • Firegrate area
20.5 sq ft (1.90 m2)
Boiler pressure Ec: 200 lbf/in2 (1.38 MPa)
L: 160 lbf/in2 (1.10 MPa)
Valve gear Walschaerts
Performance figures
Tractive effort Ec: 16,000 lbf (71.17 kN)
L: 17,952 lbf (79.85 kN)
Factor of adh. Ec: 4.5, L: 3.5
Career
Operators Western Australian Government Railways
Numbers Ec236-Ec255
Nicknames Bull Yanks
First run 1901
Retired 1958
Disposition all scrapped
Type and origin
Power type Steam
Builder Baldwin Locomotive Works
Total produced 20
Rebuilder Midland Railway Workshops
Rebuild date 1924-25 as L class
Number rebuilt 20
Specifications
Configuration:
 • Whyte 4-6-2
Gauge 3 ft 6 in (1,067 mm)
Total weight Ec: 73 long tons 0 cwt (163,500 lb or 74.2 t)
L: 77 long tons 12 cwt (173,800 lb or 78.8 t)
Fuel type Coal
Fuel capacity 5 long tons 0 cwt (11,200 lb or 5.1 t)
Water cap 2,500 imp gal (11,000 l; 3,000 US gal)
Firebox:
 • Firegrate area
20.5 sq ft (1.90 m2)
Boiler pressure Ec: 200 lbf/in2 (1.38 MPa)
L: 160 lbf/in2 (1.10 MPa)
Valve gear Walschaerts
Performance figures
Tractive effort Ec: 16,000 lbf (71.17 kN)
L: 17,952 lbf (79.85 kN)
Factor of adh. Ec: 4.5, L: 3.5
Career
Operators Western Australian Government Railways
Numbers Ec236-Ec255
Nicknames Bull Yanks
First run 1901
Retired 1958
Disposition all scrapped

The WAGR Ec class was a class of 4-6-2 heavy passenger and goods Vauclain compound locomotives operated by the Western Australian Government Railways (WAGR) between 1901 and 1958.

A total of 20 Ec class engines were built by Baldwin Locomotive Works, Philadelphia, in the first half of 1901, and entered service with the WAGR later that year. The following year, Baldwin built the first of two batches of the C class, a lighter version of the Ec class.

Initially, the Ec class' main task was to haul heavy trains on the Eastern Goldfields Railway. Between 1920 and 1923, nine Ec class engines were lightened for use on the lightly laid Northam to Mullewa line, and reclassified as the Eca class.

All 20 were withdrawn between 1923 and 1925, with the frames, wheels, cabs and tenders married with new boilers, cylinders and valve gear at Midland Railway Workshops to become the L class. The costs of the rebuilds were recovered within four years through lower maintenance costs.

By the early 1930s, frame cracks were beginning to appear with 14 receiving new frames. They were replaced in the 1950s by the W class.


...
Wikipedia

...