The Uganda National Roads Authority (UNRA) is a government agency mandated to develop and maintain the national roads network, advise the government on general roads policy, contribute to the addressing of national transport concerns, and perform certain other functions. UNRA is charged with, among other things, the selection of contractors, the supervision of construction, the scheduling of maintenance, and the prioritization of national road works.
The headquarters of UNRA are located in the UAP Nakawa Business Park, at 3-5 New Port Bell Road, in the Nakawa Division of Kampala, Uganda's capital and largest city. The geographical coordinates of UNRA's headquarters are:0°19'40.0"N, 32°36'46.0"E (Longitude:0.327778; Latitude:32.612778).
UNRA was established in 2006 by parliamentary enactment of the Uganda National Roads Authority Act. UNRA became fully operational on 1 July 2008.
UNRA is governed by a nine-member board of directors, chaired by Angela Kanyina Kiryabwire. The first Chairman of the Board of Directors was Mr. Chris Kassami who spearheaded the process of setting up the original UNRA management structures. The pioneer Executive Director was Eng. Peter Ssebanakitta who was appointed to the post on 1 November 2007 and set upon working with the Board to recruit staff into the UNRA structures. UNRA became operational on 1 July 2008 with about 80% of the established posts filled. Eng. Ssebanakitta served as Executive Director up to 3 March 2013 when he resigned for personal reasons. He was succeeded in acting capacity by Engineer Ssebbugga Kimeze who was subsequently replaced by Eng. James Okiror when he was suspended following the botched procurement of a contractor for the Mukono–Kyetume–Katosi–Nyenga Road. The current executive director is Allen Kagina who replaced Engineer Okiror in May 2014. She replaced acting executive director James Okiror.
During the first five years of the agency, the road network increased from 10,800 kilometres (6,700 mi) to 21,000 kilometres (13,000 mi).
According to a published report in July 2015, 4,000 kilometres (2,500 mi) (19 percent) of the 21,000 kilometres (13,000 mi) national road network was paved. A total of 1,500 kilometres (930 mi) of roads were improved from gravel to bituminous surface between 2005 and 2010. A total of 5,000 kilometres (3,107 mi) of roads are earmarked for tarmacking before December 2016.
Some of the roads that have been completed since 2008 include:
As of October 2017, the following major construction projects under UNRA's supervision were ongoing.