*** Welcome to piglix ***

USS Ramage (DDG-61)

A grey ship with flags flying arrives in port
USS Ramage returns to Naval Station Norfolk in 2009
History
United States
Name: USS Ramage
Namesake: Lawson P. Ramage
Ordered: 21 February 1990
Builder: Ingalls Shipbuilding, Pascagoula, Mississippi
Laid down: 4 January 1993
Launched: 1 February 1994
Commissioned: 22 July 1995
Homeport: Norfolk, Virginia
Motto: Par Excellence
Status: in active service
Badge: USS Ramage (DDG-61) crest.png
General characteristics
Class and type: Arleigh Burke-class destroyer
Displacement:
  • Light: approx. 6,800 long tons (6,900 t)
  • Full: approx. 8,900 long tons (9,000 t)
Length: 505 ft (154 m)
Beam: 66 ft (20 m)
Draft: 31 ft (9.4 m)
Propulsion: 4 General Electric LM2500-30 gas turbines, two shafts, 100,000 total shaft horsepower (75 MW)
Speed: >30 knots (56 km/h)
Range:
Complement:
Sensors and
processing systems:
Electronic warfare
& decoys:
Armament:
Aircraft carried: 2 Sikorsky MH-60R helicopters can be embarked

USS Ramage (DDG-61) is an Arleigh Burke-class guided missile destroyer of the United States Navy. The ship is named for Vice Admiral Lawson P. Ramage, a notable submarine commander and Medal of Honor recipient in World War II.

Ramage was laid down 4 January 1993 at the Ingalls Shipbuilding in Pascagoula, Mississippi, launched 11 February 1994, sponsored by Barbara Ramage (wife of the admiral), and commissioned 22 July 1995.

Ramage was constructed utilizing efficient modular shipbuilding techniques pioneered by Ingalls in the 1970s and enhanced in recent years through the development of Product-Oriented Shipbuilding Technology (POST).

These innovative techniques allow a large ship, such as Ramage, to be built in three separate hull and superstructure modules and later joined to form the complete ship. Heavy machinery, such as propulsion equipment, as well as piping, duct work, and electrical cabling were installed in hundreds of sub-assemblies, which were joined to form dozens of assemblies. These assemblies were then joined to form the three hull modules. The ship's superstructure, or "deck house", was lifted atop the mid-body module early in the assembly process.

Ramage's launching was as unique as her construction. The ship was moved over land via Ingalls' wheel-on-rail transfer system and onto the shipyard's launch and recovery drydock. The drydock was ballasted down, and DDG-61 floated free on 11 February 1994. She was then moved to her outfitting dock in preparation for the traditional christening ceremony and completion of outfitting and testing.

On 25 November 1996, Ramage embarked on her maiden deployment to the Mediterranean Sea. Ramage visited six countries and made 16 port calls. Ramage was awarded the Meritorious Unit Commendation ribbon, the Sea Service Ribbon, and the Armed Forces Service Medal during this deployment.


...
Wikipedia

...