*** Welcome to piglix ***

Type 922 rescue and salvage ship


Type 922 rescue and salvage ship is a series of rescue and salvage ships developed by China for the People's Liberation Army Navy (PLAN), and after decades of service they still remain active in other Chinese governmental establishments.

Type 922 is the first model of Type 922 series, and it was converted from a 3400-ton cargo ship transferred from Ministry of Transportation. Order to develop rescue and salvage ship was issued on October 27, 1960 and on July 16, 1962, the design was approved. Construction begun in early 1964 after nearly a year of preparation and in July 1965, the ship was launched. Sea trials were successfully completed on July 27, 1966 and test runs for rescue and salvage operations were completed in November of the same year in . The ship was formally handed to PLAN in December 1966 as Hai-Jiu (海救, meaning Sea Rescue) 403.

Type 922II is the development resulted from experience gained from the deployment of Type 922II.On May 5, 1970, a dedicated design was proposed by to the 708th Institute of China State Shipbuilding Corporation, which is also more commonly known as China Shipbuilding and Oceanic Engineering Design Academy (中国船舶及海洋工程设计研究) nowadays. On April 15, 1971, design review of the design begun at Guangzhou. Construction begun at Guangzhou Shipyard International on September 20, 1971, and the ship was launched on September 27, 1973. Sea trials begun in August 1975 and was concluded on January 10, 1976. Test for rescue operations begun on April 23, 1976 and was concluded on June 14, 1976. The ship was formally handed over to PLAN on June 30, 1976 with pennant number as Nan-Jiu (南救, meaning South Rescue) 503, and received NATO reporting name as Dalang (大浪), meaning Big Wave in Chinese. After three decades of service, Type 922II was transferred to Chinese Fishery Administration on November 27, 2006 and remains active to this day. Specification:

Type 922III was originally planned in 1978, but original design had to be modified to meet the updated requirement. In September 1982, design work was completed and construction begun on December 20, 1982 at Wuchang Shipyard. The ship was originally scheduled to be built by Guangzhou Shipyard International but a decision was made on May 27, 1982 to have it built at Wuchang Shipyard instead. Type 922III was launched on May 20, 1983, and after traveling to Shanghai, begun sea trials on April 17, 1986. Further tests were conducted in Zhoushan from May 28 to June 17, 1986, and in Qingdao and Dalian from July 21 to September 2, 1986. Trials revealed some modification was needed and after such modifications were completed, the ship was formally handed to PLAN as Bei-Jiu (北救, meaning North Rescue in Chinese) 122 in Qingdao on March 31, 1987. Type 922III is armed with twin 37 mm guns and received NATO reporting name Dalang II class.


...
Wikipedia

...