Autodromo (CAM) / MAN articulated trolleybus, on the first day of service for the type, in 2000.
|
|||||||||||||
Operation | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Locale | Modena, Emilia-Romagna, Italy | ||||||||||||
|
The Modena trolleybus system (Italian: Rete filoviaria di Modena) forms part of the public transport network of the city and comune of Modena, in the region of Emilia-Romagna, northern Italy.
In operation since 1950, the system has undergone several phases of expansion and contraction over the decades, including a re-launching since the start of 2000. It presently comprises three lines, and is one of the largest trolleybus systems in Italy.
In 1949, the comune of Modena decided to replace the city's tram network with a trolleybus system, believed to be more efficient and modern. The first two lines of the planned system (3-barrato Centro - San Faustino and 5 Viale Buon Pastore - San Cataldo) were opened on 22 January 1950. In the following months, the system was expanded gradually at the expense of the trams, with all of the initial lines (1 to 5) opening by 21 October 1950. Lines 1 and 2 were an "inter-station" service, between Modena FS railway station and Modena Piazza Manzoni railway station (or Stazione Ferrovie Provinciali), with the southern portion configured as a two-way loop, line 1 running clockwise and 2 counterclockwise.
In 1952, after almost two years of service, it became necessary to revise the system, in light of observed traffic flows. Line 5 was extended, and there was a new line 6.
On 30 September 1954, a new line 7 was opened (Piazza Torre - Via Farini - Sacca), to provide a proper service to the new Sacca district, located north of the Milan–Bologna railway. This line remained in operation for little more than one year; the comune lacked the resources to extend the line westward to the village of Madonnina (and in particular to equip the homonymous overpass with overhead wires). The line was therefore operated by conventional buses until 1959, when the Madonnina extension was finally electrified, and the opportunity was taken for a second reorganisation of the system.