Tamagawa-Jōsui Station
玉川上水駅 |
|
---|---|
Tamagawa-Jōsui Station
|
|
Location |
Tachikawa, Tokyo and Higashiyamato, Tokyo Japan |
Operated by |
|
Line(s) | |
Connections |
|
SS33
Tamagawa-Jōsui Station 玉川上水駅 |
|
---|---|
Seibu Railway | |
Tamagawa-Jōsui Station platforms
|
|
Location | 6-36-1 Saiwai-chō, Tachikawa-shi, Tokyo (東京都立川市幸町6-36-1) Japan |
Operated by | Seibu Railway |
Line(s) | Seibu Haijima Line |
Platforms | 2 island platforms |
Other information | |
Station code | SS33 |
History | |
Opened | 1950 |
Traffic | |
Passengers (FY2013) | 40,393 |
Tamagawajosui Station
玉川上水駅 |
|
---|---|
Monorail | |
Tamagawajosui Exit
|
|
Location |
4-19 Sakuragaoka, Higashiyamato-shi, Tokyo Japan |
Operated by | Tokyo Tama Intercity Monorail |
Line(s) | ■ Tama Toshi Monorail Line |
Platforms | 2 side platforms |
Other information | |
Station code | |
History | |
Opened | 1998 |
Traffic | |
Passengers (FY2013) | 10,766 |
Tamagawa-Jōsui Station (玉川上水駅 Tamagawa Jōsui-eki) is a railway station in Tachikawa, Tokyo, Japan, operated by the private railway operator Seibu Railway, and a monorail station operated by the Tokyo Tama Intercity Monorail in Higashiyamato, Tokyo, Japan. The two stations are adjacent to, and at right angles to one another, with the border between the two cities passing in between the stations. The names of the stations are identical in Japanese, but are transliterated slightly different in romaji such that the Seibu Station is Tamagawa-Jōsui Station, whereas the Tokyo Tama Intercity Monorail is Tamagawajosui Station (i.e. without the hypen or diacritic mark).
Tamagawa-Jōsui Station is served by the Seibu Haijima Line, and is 7.2 kilometers from the terminus of that line at Kodaira Station. The monorail station is served by the Tama Toshi Monorail Line and is 1.5 kilometers from the terminus of the line at Kamikitadai Station
The Seibu station consists of two island platforms served by three tracks. In between the two island platforms, there is a single track.
4-19 Sakuragaoka, Higashiyamato-shi, Tokyo
(東京都東大和市桜が丘四丁目19番地
The elevated station consists of two side platforms served by two tracks.
The Seibu station opened on May 15, 1950. The Tama Toshi Monorail station opened on November 27, 1998.
An enclosed waiting room was built on the Haijima Line platform in November 2007.
In fiscal 2013, the Seibu station was the 23rd busiest on the Seibu network with an average of 40,393 passengers daily.
The passenger figures for the Seibu station for previous years are as shown below.
The station area is a mix of residential apartment blocks and commercial buildings. Tamagawa-Jōsui, the source waterway of the Tama River, flows to the south of the station. The Risshō Kōsei Kai Kōsei cemetery is a short walk northwest.