*** Welcome to piglix ***

Sultan Mahmud Badaruddin II International Airport

Sultan Mahmud Badaruddin II International Airport (SMB II)
Bandar Udara Internasional Sultan Mahmud Badaruddin II (SMB II)
PesawatdiSMB2IA.jpg
Summary
Airport type Public
Owner Government of Indonesia
Operator PT Angkasa Pura II
Serves Palembang
Location Palembang, South Sumatra
Hub for
Elevation AMSL 121 ft / 37 m
Coordinates 02°54′01″S 104°42′00″E / 2.90028°S 104.70000°E / -2.90028; 104.70000Coordinates: 02°54′01″S 104°42′00″E / 2.90028°S 104.70000°E / -2.90028; 104.70000
Website smbadaruddin2-airport.co.id
Maps
Sumatra region in Indonesia
Sumatra region in Indonesia
PLM is located in Sumatra Topography
PLM
PLM
PLM is located in Indonesia
PLM
PLM
Location in Sumatra
Runways
Direction Length Surface
ft m
11/29 9,843 3,000 Asphalt

Sultan Mahmud Badaruddin II Airport (Indonesian: Bandar Udara Internasional Sultan Mahmud Badarudin II) (IATA: PLMICAO: WIPP) is an international airport serving the city of Palembang, South Sumatra and surrounding areas. It is in the region KM.10 Sukarame District. It is named after Sultan Mahmud Badaruddin, the last Sultan of Palembang.

At least as early as 1938, Palembang was served by a civil airport at Talang Betutu, operating as a Customs Aerodrome equipped with wireless and direction finding equipment, and basic ground facilities. For Allies the airport was known as Palembang P1 (or just P1). The airport was re-built by the Japanese army during the Japanese occupation in 1942-1943. On July 15, 1963, it was a joint airfield, for civilian and military purposes. Then on August 21, 1975 the status of became Talang Betutu Civil Airports. On April 3, 1985, the name changed to Sultan Mahmud Badaruddin II Airport.

Effective 1 April 1991, the airport is officially managed by the Management of Perum Angkasa Pura II. On January 2, 1992 Management Perum Angkasa Pura II changed its status into PT (Persero) Angkasa Pura II.

When South Sumatra Province was chosen as the host of PON XVI in 2004, the government soughts to enlarge the capacity of the airport as well as change the status into an international airport. New terminal building Airport Sultan Mahmud Badaruddin II was completed and inaugurated on September 27, 2005.

It has officially become an international airport and can accommodate the wide-body aircraft as of September 27, 2005. The development started on September 18, 2003 with a total cost of Rp366, 7 billion from the Japan International Bank Corporation IDR 251,9 billion and matching funds from the state budget amounting to IDR 114,8 billion.

Between the development undertaken is an extension of the runway along the 300 meters x 60 meters to 3,000 meters x 60 meters, construction vehicle parking area of 20,000 meters which can accommodate 1,000 vehicles as well as the construction of a three-floor passenger terminal covering 13,000 square meters which can accommodate 1,250 passengers, equipped aerobridges and cargo terminals, and other support buildings covering an area of 1900 square meters.


...
Wikipedia

...