*** Welcome to piglix ***

Stonehouse (Burdett Road) railway station

Stonehouse National Rail
Stonehouse railway station1.jpg
Location
Place Stonehouse
Local authority Stroud (district)
Coordinates 51°44′46″N 2°16′48″W / 51.746°N 2.280°W / 51.746; -2.280Coordinates: 51°44′46″N 2°16′48″W / 51.746°N 2.280°W / 51.746; -2.280
Grid reference SO808052
Operations
Station code SHU
Managed by Great Western Railway
Number of platforms 2
DfT category E
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2011/12 Increase 136,556
2012/13 Increase 146,856
2013/14 Decrease 140,848
2014/15 Increase 148,380
2015/16 Increase 148,786
National RailUK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Stonehouse from Office of Rail and Road statistics. Methodology may vary year on year.
170433 at Edinburgh Waverley.JPG

Stonehouse railway station is a railway station that serves the town of Stonehouse in Gloucestershire, England. The station is located on the Swindon-Gloucester "Golden Valley" line.

The station was formerly called Stonehouse Burdett Road to distinguish it from a second station, Stonehouse (Bristol Road), on the line between Bristol and Gloucester. Stonehouse Bristol Road closed to passengers under the Beeching Axe in 1965 and to goods traffic the following year.

The station has two platforms, and is operated by Great Western Railway. The station has a ticket office, located on the Gloucester-bound platform; it is normally only open in the mornings, until the end of the peak period.

The platforms are short: only about 55 yards (50 m) each. This is long enough to accommodate the two-coach trains used on SwindonCheltenham Spa local services; but high speed trains running to or from London or Worcester may be up to eight coaches. Since long trains cannot be accommodated entirely, such trains running towards Gloucester normally stop with the front two coaches in the platform, and those running toward London normally stop with the rear two in the platform. Passengers intending to alight at Stonehouse are advised earlier in their journeys to proceed along the train to the relevant coaches. Since trains from Cheltenham almost always reverse at Gloucester, this can lead to confusion for cyclists as to which end of the train in which to load their bicycles.

Great Western Railway operate services from London Paddington to Gloucester and Cheltenham Spa using HST trains, and local services from Swindon to Gloucester and Cheltenham using the former Wessex Trains Class 150 two carriage sets. Trains call hourly in each direction Mon-Sat and also on Sundays (though with some two hour gaps).


...
Wikipedia

...