Spon Lane Junction

Spon Lane Junction
Spon Lane top lock and junction.jpg
Spon Lane top lock, split bridge, and junction, beneath the M5 motorway
Specifications
Status Open
Navigation authority British Waterways
History
Date completed 1772

Spon Lane Junction (grid reference SP003898) is the original junction of the Wednesbury Canal and the Birmingham Canal, near Oldbury in the West Midlands, England.

The 1768 Act of Parliament which authorised the building of the Birmingham Canal to Wolverhampton included a lucrative branch to the coal mines of Wednesbury, which was completed the following year, allowing coal to be shipped cheaply to Birmingham. Between the two termini, there was a ridge of high ground at Smethwick, which was crossed by building a flight of six locks at Smethwick, and another six at Spon Lane. Both ends were at what became known as the Birmingham Level of 453 feet (138 m) above sea level, but the locks raised the level by 38 feet (12 m) to 491 feet (150 m). When building of the Birmingham Canal main line continued towards Wolverhampton and the Staffordshire and Worcestershire Canal at Aldersley Junction, Spon Lane Junction was formed half way down the Spon Lane flight of locks, at the Wolverhampton Level of 473 feet (144 m). The canal was level to Wolverhampton, where it dropped through twenty locks (later increased by one) to reach the Staffordshire and Worcestershire Canal. The main line opened in September 1772.

Water supply to the Smethwick summit was a problem, and in 1778, a Boulton and Watt pumping engine was installed at the junction, to pump water back up the top three locks of the flight to the summit. With the opening of the Broadwaters extension of the Wednesbury Canal, which served coal mines near Moxley, there was additional traffic through the junction and over the summit, and the building of the Birmingham and Fazeley Canal threatened to make the situation worse. The company therefore decided to make the summit lower in 1787, and this was achieved in two stages. The first was a new cut 12 feet (3.7 m) lower than the original summit, which eliminated two locks at either end, and was completed on 2 July 1789. Spoil from the excavations was removed using the upper line. A second new cut was then made 6 feet (1.8 m) below this, to eliminate the third lock at each end, and the spoil was removed using the middle line. The canal had to be closed for 22 days to allow the ends of the new cut to be connected to the original channels, and for it to fill with water, but the new line was operational on 6 April 1790. Spon Lane Junction was now at the top of the three Spon Lane locks. The top lock has a split bridge, which allowed horses to cross the canal without having to disconnect the towing rope, which passed through the gap between the two halves of the bridge. This particular example is, however, a 1986 reconstruction. The remaining three locks at Smethwick were duplicated at the same time. The pumping engine at the junction now served no purpose and was removed.


...