Tucano | |
---|---|
RAF Short Tucano T1, in display colours for 2008 | |
Role | Trainer aircraft |
National origin | United Kingdom |
Manufacturer | Short Brothers |
First flight | 14 February 1986 |
Introduction | 1989 (Royal Air Force) |
Status | Out of production, in active service |
Primary users |
Royal Air Force Kenya Air Force Kuwait Air Force |
Produced | 1986–1995 |
Number built | 160 |
Developed from | Embraer EMB-312 Tucano |
The Short Tucano is a two-seat turboprop basic trainer built by Short Brothers in Belfast, Northern Ireland. It is a licence-built version of the Brazilian Embraer EMB-312 Tucano. The main operator is the Royal Air Force with exports to Kenya and Kuwait.
Development of the Tucano started in May 1984 after an agreement between Embraer and Short Brothers to meet a requirement to replace the BAC Jet Provost as a basic trainer with the Royal Air Force. The Royal Air Force issued Air Staff Target 412 to define the requirement for a high-performance turboprop trainer. A shortlist of designs competed for the contract; the other types considered were the Pilatus PC-9, the NDN-1T Turbo-Firecracker and the Australian Aircraft Consortium (AAC) A.20 Wamira II.
In 1984 Embraer sent Shorts the seventh EMB-312 airframe off the production line for modifications in order to meet AST-412 requirements. The type was displayed in September 1984 at the Farnborough Airshow featuring an uprated PT6A-25C2 engine and a ventral air brake to meet required stall speed of 60kt. However, tests undertaken at Boscombe Down later on that year indicated the need to re-engine the aircraft (to meet the RAF requirement for time to height) and the Garrett TPE331 was chosen.
On 21 March 1985, the Short Tucano proposal was declared the winner of the AST.412 contract worth £126 million for 130 aircraft and an option for a further 15. The first flight of the prototype EMB-312G2 which featured a four-bladed Hartzell propeller with the Garrett TPE331-10 engine took place in Brazil on 14 February of the following year, the aircraft being then disassembled and airlifted back to Belfast on 29 March 1986 to fly again just ten days later. In June, the TPE331-10 engine was replaced by the TPE331-12B, a major difference being the integration of an Electronic Engine Controller (EEC) system.