Seven Mile Dam

Seven Mile Dam
Coordinates 49°01′48″N 117°30′13″W / 49.0300°N 117.5037°W / 49.0300; -117.5037Coordinates: 49°01′48″N 117°30′13″W / 49.0300°N 117.5037°W / 49.0300; -117.5037
Opening date 1979
Operator(s) BC Hydro
Dam and spillways
Impounds Pend d'Oreille River
Height 65 metres (213 ft)
Width (base) 350 metres (1,150 ft)
Power station
Installed capacity 848 MW
Annual generation 2913 GWh

Seven Mile Dam is a concrete gravity-type hydroelectric dam on the Pend d'Oreille River 15 km SE of Trail, 18 km downstream from Boundary Dam and 9 km upstream from Waneta Dam in the Canadian province of British Columbia. The powerplant has a capacity of 848 MW and generates 3200 GWh per year. The May, June and early July flow of the river in most years, is greater than the plants capacity. During these times water is spilled, not used to generate power. The reservoir is 420 ha (1,040 acres), which includes 170 ha (425 acres) of flooded river channel. Under the Canal Plant Agreement operations are coordinated with Waneta Dam.



...
Wikipedia

...