*** Welcome to piglix ***

Sendai Subway Tozai Line

Sendai Subway Tozai Line
Sendai subway 2000 series.JPG
Overview
Native name 仙台市営地下鉄東西線
Type Rapid transit
Status Operational
Locale Sendai, Miyagi
Termini Yagiyama Zoological Park
Arai
Stations 13
Daily ridership Approx. 80,000 daily (forecast)
Operation
Opened 6 December 2015 (2015-12-06)
Owner Sendai City Subway Logo.png Sendai City Transportation Bureau
Depot(s) Arai
Rolling stock Sendai Subway 2000 series
Technical
Line length 13.9 km (8.6 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 1,500 V DC overhead wire
Route map