Saipem 7000

Saipem 7000 is the world's second largest crane vessel.
History
Name:
  • Saipem 7000
  • Micoperi 7000 (1987–1995)
Operator: Saipem
Ordered: 1985
Builder: Fincantieri Monfalcone Yard
Laid down: 1985
Launched: 1986
Completed: 1987
In service: 1988-to date
Identification:
Status: In service
General characteristics
Class and type: Semi-submersible crane vessel
Displacement: 172,000 t (heavy lift)
Length: 198 m (overall)
Beam: 87 m
Height: 43.5 m (keel to deck)
Draft:
  • 10.5 m (34 ft) (transit)
  • 18.0 m (59 ft) (survival)
  • 27.5 metres (90 ft) (heavy lift)
Installed power: 70,000 kW
Propulsion: 12 thrusters
Speed: 9.5 knots (17.6 km/h; 10.9 mph)
Crew: Up to 700 persons

Saipem 7000 is the world's second largest crane vessel, after the Thialf. The crane radius of the Saipem 7000 grants a lifting capability of 14,000 tonnes at 42 meters while the Thialf can lift 14,200 tonnes at 31.2 meters. It is owned by the oil and gas industry contractor Saipem S.p.A.

The Saipem 7000, originally named the Micoperi 7000, was conceived in the mid-1980s by its original owners Micoperi as a multipurpose offshore oil platform installation vessel that would be able to install very large oil production platform decks (known as integrated decks) as well as the decks' supporting structures (known as jackets) using its two very large fully revolving cranes. It would also be able to support the offshore completion of the platform by providing hotel and workshop facilities for large construction crews. Saturation Diving facilities would support subsea connection work. The vessel's size and semi-submersible form would allow it to operate in worse weather conditions than smaller and conventionally shaped vessels.

The huge cost of a vessel of this size would be offset by the cost and time savings made by the oil company as the large integrated decks could be completed, tested and commissioned onshore. Prior to the introduction of the large crane vessels offshore oil platforms were made up of 1000 - 2000 tonne modules which were lifted into place individually by smaller SSCV's or monohull crane vessels and then connected together offshore, tested and then commissioned, this often took over a year. Other savings in the installation of the jackets could also be made.

Heavy lift

The Saipem 7000 has two NOV Lifting and Handling AmClyde model S7000 fully revolving cranes. Each has a 140-metre-long boom fitted with 4 hooks. Each crane is capable of lifting up to 7,000 tonnes at 40 m lift radius using the main hook. The auxiliary hook capacities are 1st Auxiliary 2,500 tonnes at 75 m radius and 2nd Auxiliary 900 tonnes at 115 m. The whip hook has a capacity of 120 tonnes at 150 m. The 2nd Auxiliary hook can be deployed to a water depth of 450 m. The two cranes are capable of a tandem lift of 14,000 tonnes.

Each crane was fitted with 15,600 hp (11,630 kW) engines to power the boom and load hoists, 9 tugger lines and the crane slewing system. The cranes use 48 miles (77 km) of wire rope of various diameters.

Ballast system

The S7000 was fitted with two ballast systems: A conventional pumped system which could transfer up to 24,000 tonnes of water per hour using 4 pumps and a free flooding system. The free flooding system used 2 m diameter valves to open certain compartments to the sea thus trimming or heeling the vessel. This allows the vessel to lift cargoes from barges much faster than if just the crane hoists are used.


...