*** Welcome to piglix ***

STS-97

STS-97
STS-97 Launch cropped.jpg
Space Shuttle Endeavour launches from the Kennedy Space Center, 30 November 2000
Mission type ISS assembly
Operator NASA
COSPAR ID 2000-078A
SATCAT № 26630
Mission duration 10 days, 19 hours, 58 minutes, 20 seconds
Distance travelled 7,203,000 kilometres (4,476,000 mi)
Spacecraft properties
Spacecraft Space Shuttle Endeavour
Launch mass 120,742 kilograms (266,191 lb)
Landing mass 89,758 kilograms (197,883 lb)
Payload mass 7,906 kilograms (17,430 lb)
Crew
Crew size 5
Members Brent W. Jett
Michael J. Bloomfield
Joseph R. Tanner
Marc Garneau
Carlos I. Noriega
Start of mission
Launch date 1 December 2000, 03:06 (2000-12-01UTC03:06Z) UTC
Launch site Kennedy LC-39B
End of mission
Landing date 11 December 2000, 23:04 (2000-12-11UTC23:05Z) UTC
Landing site Kennedy SLF Runway 15
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee 352 kilometres (219 mi)
Apogee 365 kilometres (227 mi)
Inclination 51.6 degrees
Period 91.7 min
Docking with ISS
Docking port PMA-3
(Unity nadir)
Docking date 2 December 2000, 19:59 UTC
Undocking date 9 December 2000, 19:13 UTC
Time docked 6 days, 23 hours, 13 minutes

Sts-97-patch.png STS-97 crew.jpg
Left to right - Front: Bloomfield, Garneau, Jett; Back: Noriega, Tanner


Space Shuttle program
← STS-92 STS-98

Sts-97-patch.png STS-97 crew.jpg
Left to right - Front: Bloomfield, Garneau, Jett; Back: Noriega, Tanner

STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Module, and delivered supplies for the station's crew.

During the 11-day mission, the primary objective was completed, which was to deliver and connect the first set of U.S.-provided solar arrays to the International Space Station. The astronauts completed three spacewalks, during which they prepared a docking port for arrival of the Destiny Laboratory Module, installed Floating Potential Probes to measure electrical potential surrounding the station, installed a camera cable outside the Unity Module, and transferred supplies, equipment and refuse between Endeavour and the station.


...
Wikipedia

...