*** Welcome to piglix ***

STS-46

STS-46
STS-46 EURECA deployment.jpg
EURECA deployment
Mission type Satellite deployment
Technology
Operator NASA
COSPAR ID 1992-049A
SATCAT № 22064
Mission duration 7 days, 23 hours, 15 minutes, 3 seconds
Distance travelled 5,344,643 kilometres (3,321,007 mi)
Orbits completed 127
Spacecraft properties
Spacecraft Space Shuttle Atlantis
Landing mass 94,676 kilograms (208,725 lb)
Payload mass 12,164 kilograms (26,817 lb)
Crew
Crew size 7
Members Loren J. Shriver
Andrew M. Allen
Claude Nicollier
Marsha S. Ivins
Jeffrey A. Hoffman
Franklin R. Chang-Diaz
Franco Malerba
Start of mission
Launch date 31 July 1992, 13:56:48 (1992-07-31UTC13:56:48Z) UTC
Launch site Kennedy LC-39A
End of mission
Landing date 8 August 1992, 13:11:50 (1992-08-08UTC13:11:51Z) UTC
Landing site Kennedy SLF Runway 33
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee 425 kilometres (264 mi)
Apogee 437 kilometres (272 mi)
Inclination 28.45 degrees
Period 93.2 min

Sts-46-patch.png Sts-46 crew.jpg
Left to right - Seated: Allen, Shriver; Standing: Ivins, Nicollier, Hoffman, Chang-Diaz, Malerba


Space Shuttle program
← STS-50 STS-47

Sts-46-patch.png Sts-46 crew.jpg
Left to right - Seated: Allen, Shriver; Standing: Ivins, Nicollier, Hoffman, Chang-Diaz, Malerba

STS-46 was a NASA Space Shuttle mission using Space Shuttle Atlantis and was launched on 31 July 1992 at 9:56:48 am EDT.

The mission's primary objectives were the deployment of the European Space Agency's EURECA (European Retrievable Carrier) and the joint NASA/Italian Space Agency Tethered Satellite System (TSS). EURECA was deployed a day later than scheduled because of a problem with its data handling system. Seven and a half hours after deployment, the spacecraft's thrusters were fired to boost EURECA to its planned operating altitude of around 310 miles. However, thruster firing was cut to six minutes from 24 minutes because of unexpected attitude data from the spacecraft. The problem was resolved, and EURECA was successfully boosted to its operational orbit on the mission's sixth day. TSS deployment also was delayed one day because of the problems with EURECA. During deployment, the satellite reached a maximum distance of only 860 feet from the orbiter instead of the planned 12.5 miles because of a jammed tether line. After numerous attempts over several days to free the tether, TSS operations were curtailed, and the satellite was stowed for return to Earth. It would be reflown in 1996 on STS-75.


...
Wikipedia

...