*** Welcome to piglix ***

SJ Rm

Rm
SJ Rm-1258.JPG
SJ Rm 1258 on July 26, 2007 in Uddevalla
Type and origin
Power type Electric
Builder ASEA
Build date 1977
Total produced 6
Specifications
Configuration:
 • AAR B-B
 • UIC Bo'Bo'
Gauge 1,435 mm (4 ft 8 12 in)
Wheel diameter 1,250 mm (49.21 in)
Length 15,520 mm (50 ft 11 in)
Loco weight 90 tonnes (89 long tons; 99 short tons)
Electric system(s) 15 kV 16 23 Hz AC catenary
Current source Pantograph
Performance figures
Maximum speed 100 km/h (62 mph)
Power output 3,600 kW (4,800 hp)
Tractive effort 310 kN (70,000 lbf)
Type and origin
Power type Electric
Builder ASEA
Build date 1977
Total produced 6
Specifications
Configuration:
 • AAR B-B
 • UIC Bo'Bo'
Gauge 1,435 mm (4 ft 8 12 in)
Wheel diameter 1,250 mm (49.21 in)
Length 15,520 mm (50 ft 11 in)
Loco weight 90 tonnes (89 long tons; 99 short tons)
Electric system(s) 15 kV 16 23 Hz AC catenary
Current source Pantograph
Performance figures
Maximum speed 100 km/h (62 mph)
Power output 3,600 kW (4,800 hp)
Tractive effort 310 kN (70,000 lbf)

The SJ Class Rm is an electric locomotive operated by Swedish State Railways (Swedish: Statens Järnvägar, SJ) and later Green Cargo. The six locomotives are variants of the Rc locomotive and built by ASEA in 1977. The difference is smaller wheels giving higher pulling force, but lower maximum speed. They were used in triple-unit configuration on Malmbanan as supplements to Dm3-units, but later moved to other parts of the Swedish rail network after the transport needs on Malmbanan were reduced. When originally used to haul iron ore they were ballasted, fitted with SA3 couplings and additional set of brakes, but all these modifications were removed when the locomotives were put in ordinary freight operation. In the 1990s they were repainted from orange to blue. When SJ was split up, they were transferred to Green Cargo, stationed in Malmö. In 2013–2014 they were used again for iron ore traffic on Malmbanan. They went between Svappavaara and Narvik for Northland Resources, using SA3 couplings. After the Northland bankruptcy they were parked but will return to service in 2016.


...
Wikipedia

...