YQM-98 R-Tern Compass Cope R |
|
---|---|
Preserved YQM-98A on display without its engine | |
Role | Unmanned aerial vehicle (UAV) |
Manufacturer | Ryan Aeronautical |
First flight | August 1974 |
Status | Canceled |
Primary user | United States Air Force |
Developed from | Ryan AQM-91 Firefly |
The Ryan YQM-98 R-Tern (also called Compass Cope R) was a developmental aerial reconnaissance drone developed by Ryan Aeronautical. It could take off and land from a runway like a manned aircraft, and operate at high altitudes for up to 24 hours to perform surveillance, communications relay, or atmospheric sampling.
"Compass Cope" was a program initiated by the United States Air Force (USAF) in 1971 to develop an upgraded reconnaissance drone that could take off and land from a runway like a manned aircraft, and operate at high altitudes for up to 24 hours to perform surveillance, communications relay, or atmospheric sampling. Two aircraft, the Boeing YQM-94 Compass Cope B, and the Ryan Aeronautical YQM-98A Compass Cope R participated in the program.
Boeing was originally selected as a sole source for the Compass Cope program, with the USAF awarding the company a contract for two YQM-94A (later YGQM-94A) demonstrator vehicles in 1971. However, Ryan then pitched an alternative, and the next year the USAF awarded Ryan a contract for two YQM-98A (later YGQM-98A) demonstrators as well.
Ryan's entry into the competition was the Model 235, an updated variant of the Model 154 / AQM-91 Firefly. The YQM-98A's general configuration was similar to that of the Boeing Compass Cope B, resembling a jet sailplane with a twin-fin tail, retractable tricycle landing gear, and an engine in a pod on its back. The engine was a Garrett YF104-GA-100 turbofan, with 4,050 pound-force (18.0 kN) thrust. The Compass Cope R had a clear resemblance to the Model 154, though its wings were straight instead of swept.
Initial flight of the first Compass Cope R demonstrator was on 17 August 1974. However, the Boeing Compass Cope B won the competition in August 1976 on the basis of lower cost, with the company awarded a contract to build preproduction prototypes of the YQM-94B operational UAV.