The Run for Tunis | |||||||
---|---|---|---|---|---|---|---|
Part of the Tunisia Campaign of the Second World War | |||||||
Tunisia 25 November – 10 December 1942 |
|||||||
|
|||||||
Belligerents | |||||||
United Kingdom United States Free France |
Germany Italy |
||||||
Commanders and leaders | |||||||
Kenneth Anderson Vyvyan Evelegh |
Walther Nehring |
The Run for Tunis was part of the Tunisia Campaign which took place during November and December 1942 during the Second World War. Once French opposition to the Allied Operation Torch landings had ceased in mid-November, the Allies made a rapid advance by a division-sized force east from Algeria, to capture Tunis and forestall an Axis build up in Tunisia and narrowly failed. Some Allied troops were fewer than 20 miles (32 km) short of Tunis by late November but the defenders counter-attacked and pushed them back nearly 20 miles (32 km), to positions which had stabilised by the end of the year.
The planners of Operation Torch had assumed that Vichy would oppose the landings and the invasion convoys had a preponderance of infantry to meet ground opposition. At Algiers the disembarkation of mobile forces for an advance did not commence until 12 November, making an advance eastwards possible only by 15 November. The Allies had only two infantry brigade groups from the British 78th Infantry Division (Major-General Vyvyan Evelegh), an armoured regimental group from the British 6th Armoured Division (Blade Force) and some additional artillery for an advance. An attempt to reach Bizerta and Tunis overland before the Axis could establish themselves, was a gamble which depended on the ability of the navy and air force to delay an Axis build-up.
Although the Allies planned for determined Vichy opposition to the Torch landings they underestimated the speed with which the Axis could reinforce Tunisia. Despite intelligence reports regarding the Axis reaction, the Allies were slow to respond and it was not until nearly two weeks after the landings that air and naval plans were made to interdict Axis sea transport to Tunis. At the end of November, naval Force K was reformed in Malta, with three cruisers and four destroyers and Force Q was formed in Bône with three cruisers and two destroyers. No Axis ships sailing to Tunis were sunk in November but the Allied navies sank seven Axis transports in early December. The success was too late because the tanks of the 10th Panzer Division had arrived. Axis convoys began to sail in daylight when they could be protected by aircraft. Night convoys resumed on completion of the extension of Axis minefields which severely restricted Force K and Force Q.