*** Welcome to piglix ***

Reedville Creek Park

Reedville Creek Park
Reedville Creek Park.JPG
Plaza area of the park with playground equipment and picnic shelter
Type Public, city
Location Hillsboro, Oregon
United States
Coordinates 45°30′31″N 122°54′14″W / 45.50861°N 122.90389°W / 45.50861; -122.90389Coordinates: 45°30′31″N 122°54′14″W / 45.50861°N 122.90389°W / 45.50861; -122.90389
Area 9.6 acres (39,000 m2)
Created 2003
Operated by Hillsboro Parks & Recreation Department
Status open
Parking 40 spaces
Website Reedville Creek Park

Reedville Creek Park is a municipal park in the Reedville neighborhood of Hillsboro, Oregon, United States. Opened in 2003, the 9.6-acre (39,000 m2) park is along Cornelius Pass Road at Francis Street in the southeast area of the city. The park includes basketball courts, children’s play equipment, a picnic shelter, tennis courts, and sports fields among other amenities. Reedville Creek was the first and is the only park in Hillsboro with a skatepark.

In 1999, Hillsboro bought a 9.6-acre (39,000 m2) parcel for park to be built at Cornelius Pass Road and Francis Street. The land, which abuts Reedville Creek, was a filbert orchard when the city made the purchase. That same year the city announced plans to build a city owned skatepark at a then undetermined location. In 2001, the parks department finalized plans for the park, which included parking, basketball courts, sports fields, tennis courts, play equipment, and the skatepark.

In March of the following year the city solicited input from residents on the design of what was then planned to be a 15,000-square-foot (1,400 m2) skatepark. At that time the name of Reedville Creek Park had been adopted. Prior to committing to a skateboard facility, the city waited to build one to ensure skateboarding and inline skating were not merely fads. Early plans estimated the cost of the structure to total approximately $100,000 for the outdoor skatepark that was to be designed to accommodate beginner and intermediate levels of ability.

During the skatepark design process, the city received over 100 suggestions from residents, primarily from teenagers. The process resulted in plans for a skatepark that featured primarily street elements such as steps and rails that skateboarders would normally find in urban settings. Mike McIntyre and his SITE Design Group were hired by the city to design the skatepark, which had then grown to a 18,000-square-foot (1,700 m2) plan and a cost of $200,000 to $300,000. The city put the construction out for bid on the entire park in May 2002, with estimates for the total cost of the park reaching as high as $1.5 million.

The city hired Corp Inc. for $1.54 million to build Reedville Creek Park in June 2002, with construction beginning that month. Hillsboro estimated the park would be completed by the end of the year. By mid-November the concrete ramps at the park had been installed. In February 2003, the park and skatepark opened. Funds to pay for the park were collected from the city’s development charges.


...
Wikipedia

...