*** Welcome to piglix ***

Rail 2000


Rail 2000 (German: Bahn 2000; French: Rail 2000, Italian: Ferrovia 2000) is a large-scale project of the Swiss Federal Railways (SFR) established in 1987 to improve the quality of the Swiss rail network. It includes measures to accelerate a number of existing connections and the modernisation of rolling stock. The federal government decision to support the project in 1986 was approved by a referendum in 1987. In 2004 the first phase was completed consisting of around 130 projects with a budget of around CHF 5.9 billion.

After years of heavy investment in roads in the postwar years, the share of rail in the total passenger market in Switzerland had been significantly reduced by the end of the 1960s. At this time SFR decided that changes were necessary to increase rail patronage. More trains were operated in order to increase frequencies; this led to a 75% increase in passengers between 1971 and 1983 on the Bern–Zürich route. In the 1970s the Swiss government and SFR decided to make further improvements in rail services. In 1972, the SFR introduced a regular interval timetable (German: Taktfahrplan). Under this timetable trains arrive and leave each station at the same minute past every hour. Services at Zurich station were reorganised so that trains arrived on each line before the hour or half-hour and left after the hour or half-hour, making it easier to change to trains on other lines. This required the provision of additional platforms to allow every train to be in station simultaneously. The Rail 2000 project was intended to enhance the regular interval timetable.

In the late 1960s the SFR developed a proposal for a new east-west trunkline (German: Haupttransversale, NHT). This was considered by the Swiss Transport Commission (German: Schweizerischen Gesamtverkehrskommission, GVK). In 1977 after almost six years work, the GVK submitted a 400-page report, which recommended the construction of a new railway between Geneva and Lake Constance and between Basel and Olten. On these routes, a total of 120 kilometres of new line would allow operation of trains at up to 200 kilometres per hour, similar to the French TGVs.


...
Wikipedia

...