*** Welcome to piglix ***

Pyongyanghwajon Line

P'yŏngyang Thermal Power Plant Line
Overview
Native name 평양화전선 (平壤火電線)
Type Heavy rail, Freight rail
Status Operational
Locale Pot'onggang-guyŏk and P'yŏngch'ŏn-guyŏk,
P'yŏngyang
Termini Pot'onggang
P'yŏngch'ŏn
Stations 3
Operation
Opened 21 March 1944 (Pot'onggang–P'yŏngch'ŏn)
1961 (P'yŏngyang Choch'ajang–P'yŏngyanghwajŏn)
Owner Chosen Government Railway (1944–1945)
Korean State Railway (since 1945)
Technical
Line length 3.7 km (2.3 mi)
Number of tracks Single track
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 3000 V DC Catenary
Route map
P'yŏngnam Line
P'yŏngyanghwajŏn Line Line
P'yŏngŭi Line
Pot'ong River
0.0 Pot'onggang
Youth Hero Motorway
P'yŏngyang Thermal Power Plant
Taedonggang Battery Factory
P'yŏngyang Choch'ajang3.26 Factory

...