పులిచింతల ప్రాజెక్ట్ | |
---|---|
Location of పులిచింతల ప్రాజెక్ట్ in India
|
|
Official name | K.L Rao Sagar |
Location | Between Suryapet district, Telangana and Guntur District, Andhra Pradesh |
Coordinates | 16°45′15″N 80°03′24″E / 16.75417°N 80.05667°ECoordinates: 16°45′15″N 80°03′24″E / 16.75417°N 80.05667°E |
Opening date | 7 December 2013 |
Construction cost | 1850 crore rupees |
Dam and spillways | |
Impounds | Krishna River |
Height | 42.24 m |
Length | 2,922 m |
Width (base) | 31 m |
Spillway capacity | 10 lakh cusecs |
Reservoir | |
Creates | Pulichinthala |
Total capacity | 46 tmcft |
Active capacity | 36.23 tmcft |
Catchment area | 240,732 sq.km |
Surface area | 144 sq.km |
Power station | |
Operator(s) | TSGENCO |
Commission date | 22.09.2016 |
Hydraulic head | 25 Meters |
Turbines | 4 × 30 MW Kaplan turbine |
Installed capacity | 120 MW |
Pulichintala Project called as KLRao Sagar multipurpose irrigation project is a multi purpose project serving irrigation needs, hydro power generation and flood control. It is a crucial irrigation facility for farmers of four coastal districts of West Godavari, Krishna, Guntur and Prakasam where irrigation facility for 13 lakh acres. It has 24 gates in all with balancing reservoir with a capacity of 46 tmcft at 175 feet (53 m) MSL full reservoir level (FRL). The project started impounding the water in August 2014. The cost of the project has exceeded Rs.1850 crores.
The project was first conceived in 1911 by British engineer Col Ellis. The foundation stone was laid by the then Chief Minister, N. T. Rama Rao on 13 November 1988 at a projected cost of 188 crores. It was the first project to start under the ambitious Jalayagnam in the year 2004-05. which has been started by Y. S. Rajasekhara Reddy, the then chief minister of Andhra Pradesh. . It was opened on 7 December 2013 by Chief Minister of Andhra Pradesh, Kiran Kumar Reddy. Pulichintala project is located in Guntur District, Andra Pradesh State.
It is located in Pulichintala village in Guntur district and Nemalipuri village on left bank side of the river in Suryapet district of Telangana state across the Krishna River, between Prakasam Barrage at Vijayawada and the Nagarjuna Sagar dam.
It has 30 Tmcft live storage capacity to impound the Krishna river flood waters generated from the catchment area located downstream of Nagarjunasagar Dam. This reservoir provides timely water supply needed by Prakasam Barrage minimising Krishna water wastage to the sea. Water to the Prakasam Barrage can be supplied from Pattiseema lift / Polavaram irrigation canal during monsoon months only when there is water shortage in Pulichintala reservoir.