Princess Juliana Airport

Princess Juliana
International Airport
Airport, Terminal JP5766234.jpg
Summary
Airport type Public
Owner Princess Juliana Int'l Airport Holding Company N.V.
Location Saint Maarten (Saint Martin)
Hub for
Elevation AMSL 14 ft / 4 m
Coordinates 18°02′27″N 063°06′34″W / 18.04083°N 63.10944°W / 18.04083; -63.10944Coordinates: 18°02′27″N 063°06′34″W / 18.04083°N 63.10944°W / 18.04083; -63.10944
Website sxmairport.com
Map
SXM is located in Sint Maarten
SXM
SXM
Location in Sint Maarten
Runways
Direction Length Surface
m ft
10/28 2,300 7,546 Asphalt/Concrete
Source: airnav.com

Princess Juliana International Airport (IATA: SXMICAO: TNCM) (also known as Saint Maarten International Airport) is the main airport on the Caribbean island of Saint Martin, located on the Dutch side of the island in the country of Sint Maarten. In 2010, the airport handled 1,645,105 passengers and 60,870 aircraft movements. The airport serves as a hub for Windward Islands Airways and is the major gateway for the smaller Leeward Islands, including Anguilla, Saba, St. Barthélemy and St. Eustatius. It is named after Juliana of the Netherlands, who as crown princess landed here in 1944, the year after the airport opened. There is also an airport on the French side of the island, called Aéroport de Grand Case or L'Espérance Airport.

The airport is perhaps best known for very low-altitude flyover landing approaches due to one end of its runway being extremely close to the shore and Maho Beach.

The airport was started as a military airstrip in 1942. It was converted to a civilian airport in 1943. In 1964 the airport was remodeled and relocated, with a new terminal building and control tower. The facilities were upgraded in 1985 and 2001.

Because of increased passenger traffic and the expected growth of passenger traffic in the near future, Princess Juliana International Airport is being heavily modernized following a three-phased masterplan, commissioned in 1997.

Phase I was a short-term program in order to upgrade existing facilities and improve the level of service at various points. This included widening, strengthening and renovating the runway, increasing the bearing capacity of the taxiways, construction of a new apron and an upgrade of the (old) terminal. Phase I was completed in 2001.


...