*** Welcome to piglix ***

Pochentong International Airport

Phnom Penh International Airport
អាកាសយានដ្ឋានអន្តរជាតិភ្នំពេញ
Aéroport International de Phnom Penh
Cambodia Airport group logo.png
Phnom penh airport.JPG
Summary
Airport type Public / Military
Operator Cambodia Airport Management Services
Serves Phnom Penh, Cambodia
Hub for Cambodia Angkor Air
Bassaka Air
Cambodia Bayon Airlines
Elevation AMSL 40 ft / 12 m
Coordinates 11°32′47″N 104°50′38″E / 11.54639°N 104.84389°E / 11.54639; 104.84389Coordinates: 11°32′47″N 104°50′38″E / 11.54639°N 104.84389°E / 11.54639; 104.84389
Website www.cambodia-airports.com/index.php
Map
PNH is located in Cambodia
PNH
PNH
Location of airport in Cambodia
Runways
Direction Length Surface
m ft
05/23 3,000 10,000 Asphalt
Statistics (2016)
Passenger movements 3,388,553 Increase10.05%
Airfreight movements in tonnes 45,655 Increase25.5%
Aircraft movements 33,435 Increase6.45%
Passenger movements 3,388,553 Increase10.05%
Airfreight movements in tonnes 45,655 Increase25.5%
Aircraft movements 33,435 Increase6.45%

Phnom Penh International Airport (IATA: PNHICAO: VDPP) (Khmer: អាកាសយានដ្ឋានអន្តរជាតិភ្នំពេញ French: Aéroport International de Phnom Penh), is the largest airport in Cambodia containing land area of 400 hectares. It is located 10 kilometres (5.4 NM) west of Phnom Penh, the nation's capital.

Phnom Penh airport's former name was Pochentong International Airport (Khmer: អាកាសយានដ្ឋានអន្តរជាតិពោធិ៍ចិនតុង).

On 6 July 1995, the Royal Government of Cambodia (RGC) signed a concession agreement with the French–Malaysian joint venture company Société Concessionaire d'Aéroport (SCA), to operate Phnom Penh (PNH) – Pochentong International Airport. In return for a 20-year concession, SCA—70 percent owned by Groupe GTM and 30 percent by Muhibbah Masterron of Malaysia—committed to a $100 million improvement program that includes the construction of a new runway, terminal and cargo buildings, hangars, installation of a Cat III level Instrument Landing System (ILS) and associated approach lighting.

The Berger Group was selected by the RGC to provide independent engineering services during the concession, to audit the design and to advise on the practicality and cost of the concession's proposed improvements. The Berger team also supervised the initial works to accommodate widebody aircraft such as 747s, including asphalt concrete runway overlays; installation of new ILS, metrological equipment, runway lighting and generator and power systems; and construction of a new fire station, taxiway and turn-pad extensions.

Following the successful completion of the initial works, the Berger team provided design review and independent engineering services for the construction of a new 20,000-square-metre (220,000 sq ft) terminal building to accommodate growing tourist traffic. The $20 million terminal building includes five mobile aerobridges, over 1000 auto parking spaces and VIP and CIP facilities.

The airport also has a Dairy Queen inside. It is one of the first international franchises that have opened up in Cambodia. Also, the first Starbucks Coffee, in Cambodia, has also just been opened in the new terminal.


...
Wikipedia

...