Rapid transit / Metro | ||||||||||||
Owned by | Rapid MetroRail Gurgaon Ltd. (RMGL) | |||||||||||
Operated by | Rapid MetroRail Gurgaon | |||||||||||
Platforms |
|
|||||||||||
Tracks | 2 | |||||||||||
Construction | ||||||||||||
Structure type | Elevated | |||||||||||
Platform levels | 2 | |||||||||||
History | ||||||||||||
Opened | 14 November 2013 | |||||||||||
Electrified | 750 V, DC via third rail | |||||||||||
Services | ||||||||||||
|
Platform-1 →
Phase 3 is a station of the Rapid MetroRail Gurgaon opened in November 2013.