The Peak 2 Peak Gondola is a tri-cable gondola lift located in Whistler, British Columbia that links Whistler Mountain's Roundhouse Lodge with Blackcomb Mountain's Rendezvous Lodge. It is the first lift to join the two side-by-side mountains. It holds world records for the longest free span between ropeway towers—3.03 kilometres (1.88 miles) and highest point above the ground—436 metres (1,430 feet.) (A temporary aerial tramway in Switzerland used between 1979 and 1986 had larger span.) The Peak 2 Peak Gondola was built by the Doppelmayr Garaventa Group in 2007 and 2008 at a cost of CDN$51 million. The Peak 2 Peak Gondola is the first Doppelmayr "3S" tri-cable lift in North America; there are four similar but smaller lifts in Europe which were built in 1991, 1994, 2002, 2004 and 2010 in Switzerland, Austria, France and Germany. Whistler-Blackcomb has touted the gondola as an iconic attraction and uses it to transport skiers in the winter months as well as sightseers year round.
Whistler Mountain was opened by the Garibaldi Lift Company in 1965 and Blackcomb opened under separate ownership in 1980. It wasn’t until 1997 when Intrawest, the owner of Blackcomb Mountain, bought Whistler Mountain and brought both mountains together on a single lift ticket. Ever since, many skiers wanted a way to be able to ski both mountains in one day without having to ski down to the village and ride multiple lifts to get back to the alpine. In 1997, Whistler-Blackcomb's Director of Mountain Operations, Hugh Smythe, and Paul Mathews, president of Ecosign Mountain Resort Planners, took a trip to Zermatt, Switzerland. After seeing the number of lifts connecting resorts around the Matterhorn, they got the idea of connecting Whistler and Blackcomb Mountains with a ropeway.
A number of problems prevented a connection for years. Fitzsimmons Creek and the steep faces on either side were unsuitable as ski terrain and are protected land. A traditional chairlift or gondola would have had to go all the way down one mountain, across Fitzsimmons Creek, and up the other side, resulting in a long lift ride and environmental impacts. A gondola that could cross the valley without going to the bottom was the best option. Whistler-Blackcomb had to consider the extremely high cost of building such a lift. The resort conducted research that indicated 92% of winter visitors and 86% of summer visitors would use the gondola at least once.HSBC Bank Canada and Scotia Capital agreed to provide Intrawest with financing for the project, allowing it to move forward.