Palm Jumeirah Monorail

Palm Jumeirah Monorail
Dubai Monorail 01.jpg
Dubai Monorail, 2009
Overview
Locale Dubai
Transit type straddle-beam monorail
Number of lines 1
Number of stations 4 (2 not open), 1 planned
Daily ridership ~40,000 (capacity), under contemporary interval 23,000. Current ridership much lower.
Website www.palm-monorail.com
Operation
Began operation April 30, 2009
Operator(s) Serco Group plc
Number of vehicles 4 (2009) (only two visually seen in July 2014)
Technical
System length 5.45 kilometres (3 mi)
Average speed 35 km/h
Top speed 70 km/h
System map
Atlantis Aquaventure
Palm Mall
Trump Tower
Gateway  T1 
Dubai Internet City  M1 

The Palm Jumeirah Monorail is a monorail line on the Palm Jumeirah island in Dubai, United Arab Emirates. The monorail connects the Palm Jumeirah to the mainland, with a planned further extension to the Red Line of the Dubai Metro. The line opened on April 30, 2009. It is the first monorail in the Middle East.

The trains are driverless, with attendants for any emergency situations.

Construction began on the 5.45-kilometre (3 mi) monorail line in March 2006, under the supervision of Marubeni Corporation, with the monorail track completed in July 2008 and vehicle testing beginning in November 2008. Originally planned to open by December 2008, the opening was delayed to April 30, 2009. In 2010, day-to-day operations were taken over by the Middle-East branch of Serco.

The project budget is US$400 million, with an additional US$190M set aside for a 2-kilometre (1 mi) future extension to the Dubai Metro. Another source speaks of a budget of US$1.1 billion. A journey on the monorail costs Dhs15 one-way, 25 return.

The Palm Jumeirah Monorail uses Hitachi Monorail straddle-type technology. The line has a theoretical capacity of 40,000 passengers per day, with trains running every few minutes during peak hours and every 15 to 20 minutes during off-peak hours. However, actual ridership averaged around 600 passengers per day during the first week, and the monorail is running "virtually empty". In July 2014, frequency was down to every 23 minutes with only one of two trains operating The electro-mechanical works are carried out by ETA-Dubai in joint venture with Hitachi-Japan.

As of May 2009, only the Atlantis Aquaventure and Gateway stations are open.

Planned extension:


...