Apollo LES Pad Abort Test. (NASA)
|
|
Mission type | Abort test |
---|---|
Operator | NASA |
Mission duration | 1 minute, 52.6 seconds |
Distance travelled | 2.32 kilometers (1.44 mi) |
Apogee | 2.82 kilometers (1.75 mi) |
Spacecraft properties | |
Spacecraft | Apollo BP-23A |
Start of mission | |
Launch date | June 29, 1965, 13:00:01 | UTC
Rocket | Apollo LES |
Launch site | White Sands LC-36 |
End of mission | |
Landing date | June 29, 1965, 13:01:54 | UTC
Project Apollo
Abort Tests |
Pad Abort Test 2 was the follow-on second abort test to Pad Abort Test 1 of the Apollo spacecraft.
Apollo Pad Abort Test 2 was the fifth of six unmanned Apollo missions that flight tested the capability of the launch escape system (LES) to provide for safe recovery of Apollo crews under critical abort conditions. This flight was the second test of the launch escape system with the abort initiated from the launch pad.
The launch escape system included qualified launch escape and pitch motors and was equipped with canards to orient the vehicle aft heat shield forward prior to tower jettison and parachute deployment. A boost protective cover was also provided. The spacecraft was BP-23A, a boilerplate command module that had been used on mission A-002 and refurbished to more nearly simulate a Block-I-type command module in mass and other characteristics. The Earth landing system was similar to the one used in mission A-003.
The test flight was conducted on June 29, 1965. The vehicle was lifted from Launch Complex 36 by the Launch Escape motor at 13:00:01 UTC (06:00:01 MST). The launch escape and pitch control motors ignited simultaneously, placing the test vehicle into the planned initial trajectory. A moderate roll rate developed at lift-off, which was due to the aerodynamic asymmetry of the vehicle configuration; however, the roll rate did not affect the success of the test.
The canard surfaces deployed and turned the vehicle to the desired orientation for drogue parachute deployment. During the turnaround maneuver, the launch escape tower and forward heat shield were jettisoned as planned. The boost protective cover, which was attached to the launch escape system, protected the conical surface of the command module and remained intact through a canard-induced pitch maneuver. At tower jettison, the soft boost protective cover, as expected, collapsed because of differential pressure during removal from the command module. No recontact or interference between the major components was evident during tower jettison and parachute deployment.