*** Welcome to piglix ***

Nottingham Express Transit

Nottingham Express Transit
NottinghamET.svg
Nottingham-express-transit.jpg
Overview
Locale Nottingham
Transit type Tram
Number of lines 2
Number of stations 50
Annual ridership 11.6 million (2015/16)
Website www.thetram.net
Operation
Began operation 9 March 2004 (2004-03-09)
Operator(s) Nottingham Trams Ltd.
Number of vehicles 15 Bombardier Incentro AT6/5
22 Alstom Citadis 302
Technical
System length 32 km (20 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead line (750 V DC)
Top speed 50 mph (80 km/h)
System map