Nigerian Railway Corporation (commonly abbreviated as NRC) is the state-owned enterprise with exclusive rights to operate railways in Nigeria.
The Nigerian Railway Corporation traces its history to the year 1898, when the first railroad in Nigeria was constructed by the British colonial government. On October 3, 1912 the Lagos Government Railway and the Baro-Kano Railway were amalgamated, starting nationwide rail service under the name Government Department of Railways. With the passing of the Nigerian Railway Corporation Act of 1955, the company gained its current name as well as the exclusive legal right to construct and operate rail service in Nigeria. The rail network reached its maximum extent shortly after Nigerian independence, in 1964. Shortly after that, the NRC entered a long period of decline, inept management, and eventually a complete lack of maintenance of rail and locomotive assets. In 1988, NRC declared bankruptcy, and all rail traffic stopped for six months. After that, trains resumed, where the tracks were usable. By 2002, passenger service was again discontinued altogether. Starting in 2006, plans were made to restore the rail lines and add new locomotives with foreign assistance. In December 2012 regular, scheduled passenger service was restored on the Lagos to Kano line.
Nigerian Railway Corporation operates a network of 3,505 kilometers (2,178 mi) of single track lines, all have 1,067 mm (3 ft 6 in) gauge. The network comprises the following lines:
There are a few extensions of the 1,067 mm (3 ft 6 in) gauge network planned, but none of these have ever materialized since 1980, from Gusau on the branch to Kaura Namoda to Sokoto, 215 kilometers (134 mi), from Kano to Katsina, 175 kilometers (109 mi), and from Lagos to Asaba.
In the centre of the country a 1,435 mm (4 ft 8 1⁄2 in) gauge (standard gauge) network is very slowly progressing, its main line extends over 217 kilometers (135 mi) from Oturkpo to the Ajaokuta steelwork. A further 51.2 kilometers (31.8 mi) line of standard gauge is operational between the Itakp mines and the Ajaokuta steelworks. There are plans to add more standard gauge lines to these ones: Ajaokuta to Abuja and Ajaokuta to the Port of Warri, together 500 kilometers (310 mi) and from Port Harcourt to Makurdi over a distance of 463 kilometers (288 mi).